Laserfiche WebLink
HAZARDOUS MATERIALS MANAGEMENT PLAN Page 2 of 3 <br /> ` (e.g. siren, public address system, verbal VERBAL <br /> orders, etc.) <br /> EVACUATION ASSEMBLY AREA(S) (9) FRONT GATE, WEST ENTRANCE <br /> (Where employees are to report to) <br /> LOCATION OF HMMP FOR EMPLOYEE USE <br /> (10) FRONT OF TOP DRAWER, OFFICE FILE CABINET <br /> SURROUNDING OCCUPANCIES AND LAND USE SECTION (11) <br /> The following types of neighbors (e.g. residential, commercial, open space)are located within 1/8th mile of our fac <br /> Names of hospitals, schools, and day-care centers within 1/8th mile of our facility are also shown.This informatior <br /> should be provided to the 9-1-1 operator at the time of the initial notification. <br /> NORTH AUCTION YARD EAST RICE FIELD <br /> SOUTH RICE FIELD WEST OPEN FIELD THEN RESIDENCE <br /> SPILL CONTROL PROCEDURES SECTION <br /> The following types of neighbors (e.g. residential, commercial, open space) are located within 1/8th <br /> mile of our facility. Names of hospitals, schools, and day-care centers within 1/8th mile of our facilil <br /> are also shown. This information should be provided to the 9-1-1 operator at the time of the initial <br /> notification. <br /> PILL CONTROL LEADER (12) IRIS MOFFIT <br /> (also oversees inspections of areas or <br /> systems vulnerable to earthquakes) <br /> HE FOLLOWING INDIVIDUALS/POSITIONS ARE ASSIGNED TO HELP CONTROL A SPILL(13) <br /> LOYD MOFFIT, PEDRO ALCARAZ <br /> AUTHORIZED SPILL CONTROL STRATEGIES (14) <br /> This business has authorized the above personnel to perform the action(s) indicated below to control spills of <br /> ` hazardous materials on its property. Persons performing these tasks will possess written procedures for performin <br /> hem and will have received training on the procedures and equipment needed prior to carrying them out. Locatior <br /> needed equipment are shown on the facility map. At a minimum our business must isolate the area of the spill anc <br /> oke notifications. <br /> r <br /> SPILLS OF LIQUID MATERIALS <br /> Plug and Patch Container Build Retention Dike <br /> ` ! Remove Sources of Ignition Position Container so as to Stop Leak <br /> Reduce Pressure in Container/System Isolate Area and Make Notifications <br /> Neutralize Spilled Material Secure System Valves and Closures <br /> =a Shutdown System Involved Apply Absorbent Material to Spill Area <br /> L N/A <br /> L RELEASE OF COMPRESSED GASES SPILLS OF SOLID MATERIALS <br /> C� Shut Off Valves/Systems ❑ Cover Spill to Prevent Spread <br /> ❑ Ventilate Area of Release ❑ Neutralize Spilled Materials <br /> L ❑ Reduce Pressure in Container/System ❑ Position Container so as to Stop Leak <br /> ❑ Suppress Vapors with Water ❑ Place Spilled Material into Drum or Bag <br /> i ❑ Isolate Area and Make Notifications ❑ Isolate Area and Make Notifications <br /> 65 ❑ Remove Sources of Ignition ❑i N/A <br /> L <br /> L http://sjoesdata.org/gp_HMMP_detail.lasso?-Database=transaction+plan+File&-Table=c... 11/17/2005 <br />