Laserfiche WebLink
Mr. Kevin Swanson <br /> December 26, 2006 <br /> Page Three <br /> 8. If parcels created by a Parcel Map or Subdivision Map choose not to irrigate, the Developer may apply to the <br /> District for a Surface Water Irrigation Service Abandonment and Quitclaim Agreement, to be approved by <br /> the District Board of Directors. <br /> 9. California Water Code requirements will be enforced on each irrigated parcel to ensure the reasonable and <br /> beneficial uses of water. Parcels or lots within developments, which have not shown a reasonable standard <br /> of care in the preparation for the receipt of irrigation water, as determined by the District, will not be <br /> permitted to irrigate or receive water. <br /> REQUIREMENTS-DRAINAGE <br /> 1. All drainage from lands that discharge to a District facility shall be under an approved District drainage <br /> agreement and compliant with existing District policy. OID shall not accept any additional drainage resulting <br /> from development into its system. <br /> 2. A pre and post development analysis of the hydrology by a licensed engineer shall be submitted to support <br /> any proposed actions taken regarding drainage not compliant with current district policy. <br /> 3. Developments that have on-site retention ponds compliant with County standards are exempt from the <br /> requirement of having a District drainage agreement. <br /> REQUIREMENTS— EASEMENTS AND ENCROACHMENTS <br /> 1. Encroachment Agreements are required for any existing encroachments or proposed improvements within <br /> the current or requested District easement. <br /> 2. The District may require that its easements, rights-of-way, and fee title property be fenced to District <br /> Standards. The need for fencing will be evaluated on a case by case basis. This cost shall be bome by the <br /> Developer/Landowner. <br /> 3. Access gates and cross-fencing that does not impact District operations and maintenance and are not <br /> burdensome on the District may be permitted under an Encroachment Agreement. <br /> 4. For agricultural lands that continue to be farmed in the manner they have historically, the District shall make <br /> available a consensual lien process to defer the cost of fencing until such time as the parcels are sold. <br /> 5. Existing District facilities within a public road right-of-way shall be relocated into a right-of-way or easement <br /> dedicated to the District. <br /> 6. Standard Easement widths for District facilities shall be: <br /> Main Canals 100 foot centered on canal <br /> Canals/Drains 60 foot centered on canal/drain <br /> Pipelines 30 foot centered on pipeline <br /> Pipelines adjacent to roadways 20 foot <br /> Pipelines adjacent to PUE 15 foot <br /> Pump Sites 40 foot square - centered on pump <br /> 7. Easement widths for joint projects shall meet the above minimum easement widths plus any additional <br /> easement width that may be required based on the specific project uses or as approved by the Board of <br /> Directors <br />