Laserfiche WebLink
UP-93-I4 ,. <br /> Page 2 of 2 <br /> D. Construct a water well under permit and inspection of the Environmental Health Division <br /> prior to final occupancy approval. Should the number of non-resident individuals exceed 24 <br /> for at least 60 days per year, or the number of service connections exceed four, a yearly <br /> permit to operate a public water system will be required by the Environmental Health <br /> Division (San Joaquin County Development Title 22, Section 9-1120.2 and 9-1115.9.). <br /> The supplier must possess adequate financial, managerial, and technical capability to assure <br /> delivery of pure,wholesome, and potable drinking water in accordance with San Joaquin <br /> County Development Title, Sections 9-1120.2 and—91115.9 and C.C.R.,Title 22, and Health I <br /> and Safety Code, Section 116525 through 116570. <br /> E. Refuse, garbage, and other solid waste material must be stored, removed and transported to <br /> an approved landfill in accordance with San Joaquin County Ordinance Code, Section 5- <br /> 2400. <br />