Laserfiche WebLink
APPLICATION -- COMMERCIAL BUILDING PERMIT <br /> y SAN JOAQUIN COUNTY COMMUNITY DEVELOPMENT DEPARTMENT <br /> 1810 E. HAZELTON AVENUE, STOCKTON CA 95205 <br /> 7 BUSINESS PHONE: (209)468-3121 <br /> ;• INSPECTION REQUEST-24 HOUR RECORDER: (209)468-3165 <br /> - _ L <br /> PERMIT NO.` <br /> THIS PORTION OF THE APPLICATION MUST BE COMPLETELY FILLED OUT BY THE APPLICANT F <br /> IN ORDER TO APPLY FOR PERMITS REQUIRED TO BUILD A COMMERCIAL STRUCTURE. <br /> Scope of Work: G, U J <br /> Site Address: I <br /> OWNER NAME AND ADDRESS APPLICANT NAME AND ADDRESS <br /> Name: G, 4— Name: [� r <br /> Address- 2Q .MEAddress: <br /> City:��o --TO State: Ci State: <br /> ZIP: ZIP: (� Ph:( - Q <br /> CONTRACTOR INFORMATION Ph: <br /> Lia No: p 6 A C1 I Company Name: + <br /> Address:ZU y'r <br /> DESIGNER INFORMATION I Ph: <br /> Lic. No, Company Name' <br /> Address: NF_ City: �j St:CA ZIP: rQ <br /> BUSINESS INFORMATION Business Owner: rL 4,d <br /> Business Name(DBA):I'W_1k,, (,KE5 01G Mailing Address: q . <br /> a <br /> CHECKLIST <br /> THE FOLLOWING INFORMATION AND DOCUMENTATION MUST BE SUBMITTED TO DEVELOPMENT SERVICES Check <br /> BEFORE YOUR APPLICATION CAN BE PROCESSED. -Off <br /> 1. One completed application for a Commercial Building Permit. <br /> 2. Three complete sets of construction drawings prepared by an architect or engineer. (NOTE: All sheets of the working <br /> drawings must be stamped and wet signed prior to issuance of permit.) The plans must include: <br /> • Site plan. (NOTE: See the Site Plan Check List regarding requirements for the Site Plan.) <br /> { • Structural plans. <br /> • A complete floor plan, including room usage,exiting plan and complete dimensions. (NOTE: For remodels and <br /> additions,the existing and proposed floor plans must be shown in their entirety.). <br /> Plumbing and mechanical plans,including ventilation. - - <br /> • Electrical plans, including a complete one-line diagram of the service and feeders. <br /> • Disabled Access compliance. <br /> 3. Soils Report per 1802.1 thru 1802.8. <br /> 4. Two sets of structural calculations,stamped and signed with a wet signature. <br /> 5. Two-sets of complete constructionspecifications. <br /> 6. If prefabricated trusses are included in the scope of work,two sets of the following are required: <br /> • Complete truss layout designating each type of truss to be used. <br /> • Engineered truss plans and calculations which are cross-referenced to the truss layout plan. <br /> Lateral bracing plans. <br /> Details of any special features such as girder trusses, hangers between interconnected trusses,connections <br /> between trusses and beams,etc. <br /> • A letter signed by the responsible engineer or architect,stating that he/she has reviewed and approved the truss <br /> calculations and drawings,or either a shop approval stamp and signature or the responsible engineer's or architect's <br /> stamp and signature. <br /> 7. Two sets of non-residential energyGatculations with all required forms imprinted on the drawings. <br /> 8. One extra copy of the floor plan. Section 72 of the Revenue and Taxation Code now requires a copy of a complete floor <br /> plan of the proposed work to be given to the County Assessor. <br /> 9. One extra site plan to begiven to the Department of Public Works at the time of Building Permit application <br /> L10. One copy of a completed Hazardous Materials Disclosure Survey form is required if the building permit application does <br /> not require discretionaryapproval(e.g., Use Permit or Site Approval). Surveyform is attached. <br /> 11. Permit De osit L <br /> - -F:IBUILOINGIHANOOLIT8ARCHIVE PRIOR TO2008{PERMITAPP-COMMERCIAL rile 0125doe Page 1 of 5 <br /> (Revisetl 02-291-081 - <br />