My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0008100_SSNL
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
17239
>
2600 - Land Use Program
>
PA-1000031
>
SU0008100_SSNL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2020 2:24:49 PM
Creation date
9/6/2019 11:05:17 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
FileName_PostFix
SSNL
RECORD_ID
SU0008100
PE
2625
FACILITY_NAME
PA-1000031
STREET_NUMBER
17239
Direction
E
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
ESCALON
APN
20321016
ENTERED_DATE
2/16/2010 12:00:00 AM
SITE_LOCATION
17239 E LOUISE AVE
RECEIVED_DATE
2/12/2010 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\L\LOUISE\17239\PA1000031\SU0008100\NL STDY.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L _ d <br /> i <br /> TABLE OF CONTENTS <br /> SOILSUITABILITY STUDY............................................................................................1 <br /> Introduction ................................................................................................................1 <br /> ProposedDevelopment.............................................................................................1 <br /> SiteDescription...........................................................,...........,..,...............,...............1 <br /> Existing and Proposed Septic Tank Usage..............................................................2 <br /> ExistingSeptic System ...................................................................................2 <br /> ProposedSeptic System................................................................................2 <br /> On-Site Septic Permit History..........................................................................2 <br /> Existing Septic Tank Usage in the Vicinity.....................................................2 <br /> Septic Permit History in the Vicinity...............................................................2 <br /> ,Expected On-Site Maximum Septic Tank Usage ---.........3 <br /> Ground Water Information.........................................................................................3 <br /> Depth and Gradient.... ............................................... ----............3 <br /> Potential Ground Water Contamination Issues..............................................3 <br /> On-Site Wells................. 3 <br /> WaterSample............................... .................................................. .............3 <br /> Soil Profile and Geologic Information......................................................................4 <br /> SoilBorings.......................................... .........................................................5 <br /> Discussion of Soil Lithology...........................................................................6 <br /> PercolationTest.........................................................................................................6 <br /> Preparation and Presaturation of Percolation Test Holes..............................6 <br /> Percolation Test Procedure........................................................ 6 <br /> Percolation Test Results................................................................................6 <br /> Discussion of Percolation Test Results..........................................................7 <br /> Discussion of Septic System Sizing.._,.........................................................7 <br /> NITRATE LOADING STUDY...........................................................................................8 <br /> MassTransport Soil Properties ................................................................................8 <br /> Sources of Nitrate <br /> Contribution of Rainfall <br /> Quantity and Quality of Domestic Wastewater.............. <br /> Denitrification Reductions.......................................................................................12 <br /> NitrateLoading Estimate.........................................................................................12 <br /> Discussion of Nitrate Loading Results...................................................................13 <br /> TotalNitrateImpact......................................................................................13 <br /> CONCLUSIONS AND RECOMMENDATIONS .............................................................14 <br /> LIMITATIONS................................................................................................................15 <br /> SELECTED REFERENCES ..........................................................................................16 <br /> LOG E1016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.