Laserfiche WebLink
S = Sufficient n <br /> I = Insufficient <br /> S I 6.0 PERCOLATION TEST INFORMATION SECTION <br /> ❑ 6.1 Site map shhoow,iinng.the location,with concise and accurate dimensions of the percolation test holes on the parcel. <br /> EQ El 6.2 The minimurt'i Y►umber of shallow and deep percolation tests was performed for each parcel. <br /> G 7 <br /> ❑ 6.3 Description of the date,time and protocol used to prepare the test hole,including depth and dimensions of hole, <br /> preparation of hole,and depth of water used to presoak(minimum 12 inches). <br /> ❑ 6.4 DescAptibn of the date,time and condition of the test hole after the 24-hour soak period(hole still intact,hole dry, <br /> depth to water remaining in hole,etc.) <br /> bonformed to SJC Policy EHD 02-02(correct depth,diameter, 2"gravel,6"water refill, correct readings <br /> El 6.5 The tes <br /> recorded).6 17 <br /> 24 ❑ 6.6 Complete Percolation Test Form (including readings)was provided with REHS verification signature. The rate <br /> was correctly calculated using the last reading. <br /> ❑ 6.7 Discussion of any potential problems predicted and/or the need for an engineered or alternative septic system. <br /> 9 El 6.8 Discussion of percolation rates in relation to the type, size and location of future leach fields needed at the site. <br /> 7 <br /> 7.0 CONCLUSION SECTION <br /> ® ❑ 7.1 The report was signed and stamped by the appropriately registered individual <br /> Reviewed By: Reviewed Dater a <br /> EHO 26.02-003 Page 2 of 3 Soil Suitability Checklist <br /> �n•nnnv <br />