Laserfiche WebLink
SAN JOAQUIN COUNTY <br /> EI-4 VIRONMENTAL HEALTH DEPARTMENT <br /> 600 East Main Street, Stockton, CA 95202-3029 <br /> Telephone. 209 468-3420 Fax: 209 464-0138 Web:www.sjgov.org/chd <br /> NITRATE LOADING STUDY REQUIREMENT CHECKLIST <br /> �P� <br /> SITE LOCATION: PAM�3 y �� 1 � �' / � <br /> REPORT DATE:'�',t h>' L3 zz <br /> 1 <br /> S = sufficient San Joaquin County Development Title Chapter 9-1105, Section 9-1105.2 <br /> I = Insufficient <br /> S I 1.0 CHEMICAL AND PHYSICAL PROPERTIES OF SOIL <br /> ❑ 1.1 Description offtthe chemical and physical properties of the soils underlying the site. <br /> R\ ❑ 1.2 Descriptio of the mass transport properties of the soils underlying the site with respect to nitrate andlor any other <br /> i <br /> constituent identified for the project site. <br />'I 2.0 GROUNDWA4ER ANALYSIS <br /> E]_ ❑ 2.1 Description of.depth to groundwater,seasonal fluctuations of groundwater depth,directional flow and gradient. <br /> Sc c ''55,5 <br /> Q E] 2.2 Description/discussion of any existing or potential groundwater contamination issues in the general location of the <br /> site. g, S55, <br /> a❑ ❑ 2.3 Description of the current use of groundwater at the site and of the future expected use of groundwater as related <br /> to the proposed development project. X55 <br /> 3.0 SOURCES AND CALCULATED IMPACT OF NITRATE TO GROUNDWATER 5 —(2- <br /> 3.1 <br /> (z3.1 Description of all current off-site sources of nitrate to soil and groundwater in the general up gradient area and the <br /> contribution of nitrate load from these sources to the project site. <br /> 7 r rz <br /> ET ❑ 3.2 Description of impact of rainfall contribution of nitrate load to the project site. <br /> ❑ 3.3 Description of all current on-site sources of nitrate to soil and groundwater and the contribution of nitrate load from <br /> these sources to the project site. ,rte.12- <br /> 3.4 <br /> Z3.4 Description of all proposed future on-site sources of nitrate to soil and groundwater and the contribution of nitrate <br /> load from these sources to the project site. g _l Z <br /> ® ❑ 3.5 Calculated mass balance of nitrogen loading considering all potential sources identified. Use of <br /> Hanztch/Finnemore, or other appropriate formula/model,if applicable. <br />` ❑ 3.6 Calculated impact of nitrogen loading frpm site project to down gradient wells, rivers,lakes etc. <br /> 4.0 DISCUSSION OF NITRATE LOADING RESULTS RELATIVE TO PROPOSED METHOD <br /> OF WASTEWATER DISPOSAL <br /> ❑ 4.1 Discussion of total prate impact from proposed project. <br /> ❑ 4.2 Description of the mes proposed to mitigate any known or future impact to soil and groundwater from nitrate, <br /> and/or any other constituent of concern, at and/or around the proiect site <br /> i <br /> i 5.0 CONCLUSIONS AND RECOMMENDATIONS SECTION <br /> [� ❑ 5.1 The report was signed,dated and stamped by a qualified environmental professional. <br /> ® ❑ 5.2 The attachments/appendices contain sufficient documentation to support claims made in thg report. <br /> Reviewed By: Reviewed Date: !v <br /> h� <br /> EHD 26-02 Pagel of 2 Surface@ Sub Checklist <br /> 7/1412003 <br />