My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0008100
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
17239
>
2600 - Land Use Program
>
PA-1000031
>
SU0008100
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2020 2:33:05 PM
Creation date
9/6/2019 11:05:19 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0008100
PE
2625
FACILITY_NAME
PA-1000031
STREET_NUMBER
17239
Direction
E
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
ESCALON
APN
20321016
ENTERED_DATE
2/16/2010 12:00:00 AM
SITE_LOCATION
17239 E LOUISE AVE
RECEIVED_DATE
2/12/2010 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\L\LOUISE\17239\PA1000031\SU0008100\MISC.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
THOMAS R. FLINN P.O.BOX 1810.1810 E.HAZELTON AVENUE <br /> STOCKTON,CALIFORNIA 95201 <br /> DIRECTOR <br /> LA (209)468-3000 FAX(209)468-2999 <br /> www,sjgov.org/pubworks <br /> THOMAS M.GAUD - <br /> CHIEF DEPUTY DIRECTOR <br /> MICHAEL SELLING wa&iag for You <br /> DEPUTY DIRECTOR <br /> STEVEN WINKLER <br /> DEPUTY DIRECTOR <br /> ROGERJANES <br /> BUSINESS ADMINISTRATOR <br /> March 9,2010 <br /> MEMORANDUM <br /> TO: Rick Griffin, Senior Planner <br /> Community Development Department <br /> CONTACT PERSON: Mo Hatef <br /> FROM: Bill DuBois,Engineer III <br /> Public Services Division <br /> SUBJECT: PA-1000031; A Use Permit application for a fresh cut vegetable processing facility that will be <br /> constructed in two phases over a five year period. Phase I building permits to be issued within eighteen <br /> months from the effective date of approval, includes the construction of an 1,800 square foot <br /> processing building and the conversion of an existing 720 square foot building into an office. Phase H <br /> building permits to be issued within five years from the effective date of approval, includes the <br /> construction of an 1,800 square foot processing building; located on the north side of Louise Avenue, <br /> access via a gravel driveway, 1,200 feet north of Louise Avenue, in EscaIon. (Supervisorial District 4) <br /> PROPERTY OWNER: Daniel R. & Shirley A. Costa APPLICANT: Same <br /> ADDRESS: 17239 E.Louise Avenue, Stockton APN: 203-210-16 <br /> INFORMATION: <br /> The site is not currently located within a Federal Flood Insurance Administration Designated Flood Hazard Area. <br /> Louise Avenue has an existing right-of-way width of 40 feet and a planned right-of-way width of 50 feet. <br /> RECOMMENDATIONS: <br /> I. An encroachment permit shall be required for all work within road right-of-way. (Note: Driveway <br /> encroachment permits are for flatwork only—all vertical features, including but not limited to fences,walls, <br /> Eprivate light standards, rocks, landscaping and cobbles are not allowed in the right-of-way.)(Development <br /> Title Sections 9-1145.4 and 9-1145.5) <br /> 2. The driveway approach at Louise Avenue shall be improved in accordance with the requirements of San <br /> Joaquin County Standards R-17 prior to issuance of the occupancy permit. (Development Title Section 9- <br /> 1145.5) <br />
The URL can be used to link to this page
Your browser does not support the video tag.