Laserfiche WebLink
approval, includes the construction of a 1,800 square foot processing building <br /> and the conversion of an existing 720 square foot building into an office. Phase <br /> Two, building permits to be issued within five years from the effective date of <br /> approval, includes the construction of a 1,800 square foot processing building as <br /> shown on the Site Plan dated February 18, 2010. (Use Type: Agricultural <br /> Processing- Food Manufacturing) <br /> c. CAPITAL FACILITY FEE: This project may be subject to the Capital Facility Fee. <br /> If the Capital Facility Fee is applicable, the County shall collect the fees before the <br /> issuance of any building permits. (Development Title Section 9-1245.2) <br /> d. STORM DRAINAGE: Any additional stormwater drainage created by new <br /> improvements shall be retained on-site. The drainage pattern and corresponding <br /> storm drain improvements shall be shown on the Site Plan. Drainage calculations <br /> prepared by a registered civil engineer or architect shall be included. (Development <br /> Title Section 9-1135) <br /> If storm drainage will drain into the South San Joaquin Irrigation District canal, a <br /> "will-serve" letter is required from the South San Joaquin Irrigation District. <br /> e. PARKING: Off-street parking shall be provided and comply with the following: <br /> 1) All parking spaces, driveways, and maneuvering areas shall be surfaced and <br /> permanently maintained with base material of appropriate depth and chip <br /> seal to provide a durable. dust free surface. Bumper guards shall be <br /> provided when necessary to protect adjacent structures or properties <br /> (Development Title Section 9-1015.5[e]). <br /> 2) A minimum of 6 parking spaces shall be provided, including one van <br /> accessible space, for Phase I A minimum of 5 parking spaces shall be <br /> provided for Phase ll. At full buildout, 11 parking spaces shall be provided. <br /> Accessible spaces shall be located as close as possible to the primary <br /> entrance (C.C.R., Title 24). (Development Title Section 9-1015.9) <br /> f. LIGHTING: Lighting shall be provided and comply with the following: <br /> 1) If the parking area is to be used at night, parking lot and security lighting shall <br /> be installed. (Development Title Section 9-1015.5[g]) <br /> 2) Any lighting shall be designed to confine direct rays to the premises. No <br /> spillover beyond the property lines shall be permitted except onto public <br /> thoroughfares, provided, however, that such light shall not cause a hazard to <br /> motorists. (Development Title Section 9-1015.5[g][41) <br /> g ACCESS AND CIRCULATION: The following requirements apply and shall be <br /> shown on the Site Plan: <br /> 1) Access driveways shall have a width of no less than twenty-five (25) feet for <br /> two-way aisles and sixteen (16) feet for one-way aisles, except that in no case <br /> shall driveways designated as fire department access be less than twenty (20) <br /> feet wide. (Development Title Section 9-1015.5) <br /> 5 <br />