Laserfiche WebLink
S = Sufficient <br /> 1 = Insufficient v '! <br /> S I 6.0 PERCOLATION TEST INFORMATION SECTION <br /> ❑ 6.1 Si m�aapcc. owing the location, with concise and accurate dimensions of the percolation test holes on the parcel. <br /> 91 ❑ 6.2 T minimum number of shallow and deep percolation tests was performed for each parcel. <br /> ® ❑ <br /> 6.3 D plption of the date, time and protocol used to prepare the test hole, including depth and dimensions of hole, <br /> preparation hole, and depth of water used to presoak(minimum 12 inches). <br /> ® E] 6.4 Descktttio 0 the date, time and condition of the test hole after the 24-hour soak period (hole still intact, hole dry, <br /> depth to� (w, atSremaining in hole, etc.) <br /> Q El The testcdfnformed to SJC Policy EHD 02-02(correct depth, diameter, T gravel, 6" water refill, correct readings <br /> recorded)' ( W <br /> ❑ 6.6 Complete Pbrcolation Test Form (including read!pgs)wasprovided with REHS verification signature. The rate <br /> was correctly calculated using the last reading./ C) <br /> ❑ 6.7 Discussion of any potential problems predicted land/or the need for an engineered or alternative septic system. <br /> .�Y ❑ 6.8 Disc ion of perco1,ation rates in relation to the type, size and location of future leach fields needed at the site. <br /> 7.0 C CLOS )N SECTION <br /> ® ❑ Ti , Th@ report was signed and stamped by the appropriately registered individual <br /> Reviewed BY: Cr( �4'/�1r/�(l�`�/ /�% �iv�cr� Reviewed Date: <br /> EHD 26-02-003 Page 2 of 3 Soil Suitability Checklist <br />