Laserfiche WebLink
4 . Continuous monitoring devices [§146. 13 (b) (2) ] <br /> Continuous monitoring devices shall be installed and used to <br /> monitor temperature; injection pressure, flow rate, and volume; <br /> and the annular pressure between the tubing and the long string <br /> casing above the packer. <br /> 5. Automatic Alarms and Shut-Off Devices <br /> The permittee shall continuously operate and maintain an <br /> automatic warning system which will immediately notify the <br /> operators of a malfunction in the event that the injection pres- <br /> sure at the wellhead exceeds the maximum injection pressure <br /> authorized by this permit. <br /> D. REPORTING REQUIREMENTS [§146. 13 (c) ] <br /> 1. Ouarterly reports <br /> The permittee shall submit short and accurate quarterly reports <br /> to the Director containing the following information: <br /> (a) Results of the injection fluid analyses specified in <br /> permit condition Part II, Section C, Item 2 . <br /> (b) Daily and monthly average, as well as daily and monthly <br /> maximum and minimum values for the continuously monitored <br /> parameters specified in Part II, Section C, Item 3 . <br /> (c) Equipment calibration. <br /> (d) A narrative description of all non-compliance which oc- <br /> curred during the reporting period. <br /> 2 . Reports on Well Tests and Workovers [§146. 13 (c) (2) ] <br /> In the first quarterly report after the activity the permittee <br /> shall report to the Director the results of the following: <br /> (a) mechanical integrity tests; <br /> (b) other tests required by this permit; <br /> (c) any well workovers; and <br /> (d) the completion of any conditions included in Part III of <br /> this permit. <br /> Advance Notice: The permittee shall notify the Director of any <br /> scheduled mechanical integrity tests at least 30 days prior to <br /> such demonstration as required by Part I, Section H, of this <br /> permit. <br /> 19 <br />