My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004714
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
500
>
2600 - Land Use Program
>
UP-98-22
>
SU0004714
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2020 1:05:24 PM
Creation date
9/6/2019 11:06:15 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004714
PE
2627
FACILITY_NAME
UP-98-22
STREET_NUMBER
500
Direction
E
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
LATHROP
APN
19119006
ENTERED_DATE
11/18/2004 12:00:00 AM
SITE_LOCATION
500 E LOUISE AVE
RECEIVED_DATE
1/3/1989 12:00:00 AM
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\L\LOUISE\500\UP-98-22\SU0004714\APPL.PDF \MIGRATIONS\L\LOUISE\500\UP-98-22\SU0004714\CDD OK.PDF \MIGRATIONS\L\LOUISE\500\UP-98-22\SU0004714\EH COND.PDF \MIGRATIONS\L\LOUISE\500\UP-98-22\SU0004714\EH PERM.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
695
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(7-1-89 Edition) Environmental Protection Agency § 124.41 <br /> 'ator shall issue will be required to exhaust administra- permit proceedings in progress on July <br /> Ling or denying Live remedies. 3, 1980. <br /> v. To the extent (2) Notice of any final agency action (e) This Part also does not signifi- <br /> •ondittons of the regarding a PSD permit shall prompt- cantly change the way in which PSD <br /> 1 become final ly be published in the FsDx<uc REcrs- permits are processed. For the most <br /> notice of any TER. Part, these regulations will also apply <br /> ie Administrator [48 FR 14264,Apr. 1, 1993,as amended at 54 to PSD proceedings in progress on <br /> )r (b) of this see- FR 9697,Mar.7, 19891 July 18, 1980. However, because it <br /> as provided in would be disruptive to require retroac- <br /> shall set forth a §124.20 Computation of time. tively a formal administrative record <br /> the appeal and (a) Any time period scheduled to for PSD permits issued without one, <br /> nterested person begin on the occurrence of an act or §1124 9 and 124.18 will apply to PSD <br /> event shall begin on the day after the <br /> brief. Notice of permits for which draft Permits were <br /> I be sent only to act or event. prepared after the effective date of <br /> ng review. (b) Any time period scheduled to these regulations. <br /> -ator may defer begin before the occurrence of an act <br /> ppeal of a RCRA or event shall be computed so that the Subpart B—Specific Procedures Appli- <br /> this section until period ends on the day before the act cable to RCRA Permits [Re- <br /> rmal proceedings or event. served] <br /> F relating to an (c) If the final day of any time <br /> 1 to the same fa- period falls on a weekend or legal holi- Subpart C—Specific Procedures <br /> i concluding that: day, the time period shall be extended Applicable to PSD Permits <br /> �rmit is likely to to the next working day. <br /> to a decision of (d) Whenever a party or interested !3124.41 Definitions applicable to PSD <br /> peals; person has the right or is required to permits. <br /> mit is likely to be act within a prescribed period after Whenever PSD permits are proc- <br /> the service of notice or other paper eased under this part, the following <br /> interests of both upon him or her by mail, 3 days shall terms shall have the following mean- <br /> ty and the public be added to the prescribed time. ings: <br /> taterially adverse- §124.21 Effective date of Part 124. "Administrator," "EPA," and "Re- <br /> or glonal Administrator" shall have the <br /> feet is outweighed (a)Except for paragraphs(b)and(c) meanings set forth in § 124.2, except <br /> y to result from a of this section, Part 124 will become when EPA has delegated authority to <br /> on appeal. effective July 18, 1980. Because this administer those regulations to an- <br /> :he Administrator effective date will precede the process- other agency under the applicable sub- <br /> of this section is, Ing of any RCRA or UIC permits, Part section of 40 CFR 52.21, the term <br /> a prerequisite to 124 will apply in its entirety to all "EPA"shall mean the delegate agency <br /> ,ial review of the RCRA and UIC permits. and the term "Regional Administra- <br /> (b) All provisions of Part 124 per- tor" shall mean the chief administra- <br /> of Judicial review taining to the RCRA program will tive officer of the delegate agency. <br /> rriate Act, final become effective on November 19, "Application" means an application <br /> as when a final 1980• for a PSD permit. <br /> permit is issued (c)All provisions of Part 124 pertain- "Appropriate Act and Regulations" <br /> and agency review ing to the UIC program will become means the Clean Air Act and applica- <br /> hausted. A final effective July 18, 1980,but shall not be ble regulations promulgated under it. <br /> �,1 be issued by the implemented until the effective date "Approved program" means a State <br /> ttor of 40 CFR Part 146. implementation plan providing for is- <br /> ,ministrator issues (d) This part does not significantly suance of PSD permits which has been <br /> % that review has change the way in which NPDES per- approved by EPA under the Clean Air <br /> en the Administm- mits are processed. Since October 12, Act and 40 CFR Part 51. An"approved <br /> 1 on the merits of 1979, NPDES permits have been the State" is one administering an "ap- <br /> decision does not subject to almost identical require- proved program." "State Director" as <br /> �f the proceedings; ments in the revised NPDES regula- used in § 124.4 means the person(s) re- <br /> apletion of remand tions which were promulgated on June sponsible for issuing PSD permits <br /> 3roceedings are re- 7, 1979. See 44 FR 32948. To the under an approved program, or that <br /> to Administrator's extent this part changes the revised person's delegated representative. <br /> -cifieally provides NPDES permit regulations, those "Construction" has the meaning <br /> s remand decision changes will take effect as to all given in 40 CFR 52.21. <br /> 155 <br />
The URL can be used to link to this page
Your browser does not support the video tag.