Laserfiche WebLink
11. Please include a copy of any studies (soils, geology, marketing, <br /> etc. ) that you may have had prepared for this project or project <br /> site. (See Artacbment 17) <br /> C. PROJECT CHARACTERISTICS <br /> 1. Services: Indicate how the following services will be provided <br /> for your project and availability of service. <br /> Process water Sharpe Army Depot. <br /> a . Water Supply: Potable water-Lathrop Country Water District. <br /> b. Sewage Disposal: Pipeline to Lathrop County Water District <br /> C. Storm Drainage: Percolation ponds. <br /> If an extension of any of the above is necessary, indicate <br /> which service(s ) , what agency will be providing the <br /> service(s ) , and the distance of the extension(s ) : See Attachment 1115. <br /> Sewer line - CoGen to extend trunk & pressure line 3/4 mile. <br /> Potable water Cocon to supply 112 mile line to rJe-in <br /> Storm water drainage - CoGpn to supply 1 /9 mile tie-in to terminal line . <br /> d. Natural Gas : See Attachment V. <br /> e. Electricity: The plant will generate its own t ic; v. <br /> f . Road/Access ( i .e . , paved, unpaved, public/private, road name) : <br /> See Roadway Selection Attachment 118. <br /> g . Fire: Manteca-Lathrc[Aistance to nearest fire station: 2 miles <br /> h . Schools : Manteca Unified School District <br /> 2 . Describe any site alterations which result from the proposed pro- <br /> ject (specifically address the amount and location of grading, <br /> cuts and fills, vegetation removal, alterations to drainage, <br /> removal of existing structures , number of trees removed, etc. ) . <br /> Plant site will be filled to the 100 year flood elevation and finished <br /> floor will be one foot above the 100 year flood level. <br /> 3. Air Quality Information: <br /> Number and type of vehicles associated with completed project <br /> Fmpinyp_'spprcnn 1 yehirlec (apprnximately In max.) Service trnrk <br /> entry and exit (approximately 1 per day) . Maximum 22 trips per day. <br /> Types of emissions and sources associated with project Natural <br /> _ _ _ _ is source of .iii emisgions. coo Authority fin Construct Permit <br /> 11AP86-123. <br /> Fuel sources (and amounts ) to be consumed by or as a result of the <br /> completed project The plant will be fueled by pipeline quality natural gas. <br /> The facility will consume approximately 443 thousand cubic feet/ hour of fuel. <br /> Will the project result in substantial air emissions or deteriora- <br /> tion of ambient air quality? XX NO _ YES <br /> 4 . How much agricultural land will be removed from production? <br /> None. <br /> Irrigated Not irrigated <br /> Use Permit Application - 9 - ( 6/86 ) <br />