25 <br /> .r Vlor — <br /> To compute the estimated settlements shown on Plates 42 through 44, we used <br /> compression parameters that are considered typical of a compacted structural sand <br /> fill to represent the subsurface in the zone of improved materials. For total <br /> removal and replacement with compacted structural fill, the thickness of improved <br /> or replaced materials (shown on Plate 42 through 44) will be 16 ft. For the <br /> partial removal and recompaction options, the thickness of improved or replaced <br /> materials equates to the depth of removal below the existing ground surface. For <br /> DDC treatment, we would anticipate settlements to be less than the estimated <br /> settlements for an 8 ft thickness of improved soils. We anticipate post DDC <br /> settlement to be equivalent to a 12 to 16 ft depth of improvement. <br /> Because the soils are predominantly granular materials, significant portions <br /> of the settlements will occur relatively rapidly as, and shortly after, the loads <br /> are applied. We suggest that one half of the values shown on Plates 42 through <br /> 44 be considered as immediate settlements. <br /> FOUNDATION DESIGN RECOMMENDATIONS <br /> Turbine and Boiler Mat Foundations <br /> Location, Size and Loads. The boiler and turbine are to be located in the - <br /> south central part of the "plant" area. Foundation mat sizes and anticipated <br /> loads, as supplied by PSE, are given in the following table: <br /> Foundation Estimated Estimated Gross Static <br /> Dimensions (ft) Load (kips)' Bearing Pressure (psf) <br /> Turbine 81 x 15 1,140 940 <br /> Boiler 86 x 22 2,130 1,130 <br /> •Including 3.5- to 4-ft-thick foundation mat. , <br /> Recommended Foundation Type and Depth. Extensive glass deposits are present <br /> at the location of the boiler and turbine. Thus, we recommend that these two <br /> pieces of equipment be founded on piles driven into the sands that are present at <br /> about El -20 to -25 ft. Allowing for tip penetration into the sand, the planned <br /> grade raise at the site, and embedment into the pile caps, the pile order lengths <br /> are anticipated to be about, or slightly greater than, 40 ft. <br /> 1144A/CC-25McClelland <br />