Laserfiche WebLink
�. '40 <br /> INDEX <br /> 1 . 0 PROJECT DESCRIPTION <br /> 1 . 1 Overview <br /> 1 .2 Host Industrial Plant <br /> 1 .= Electric Utility Company <br /> 1.4 Fuel Utility Company <br /> 1 .5 Project Operations <br /> 2.0 FACILITY DESCRIPTION <br /> 2. 1 General <br /> 2.2 Equipment Description <br /> a. Combustion Gas Turbine Generator <br /> b. Heat Recovery Boiler <br /> c . Selective Catalytic Reduction System <br /> d. Boiler Water Treatment System <br /> e. Plant. Auxiliaries <br /> 1 . Compressed Air <br /> 2. Lube Oil Systems <br /> 3. Fuel Gas Compression System <br /> 4. Plant Cooling Water System <br /> 5. Boiler- Feedwater Chemical Treatment <br /> System <br /> f . Electrical Systems <br /> 1 . 115kV Substation <br /> 2. Auxiliary Power <br /> 3. Emergency Power System <br /> g. Fire Protection <br /> 2. 3 Buildings <br /> a. Power Control Building <br /> b. Administration/Maintenance Building <br /> 2.4 Plant Employment <br /> a. Operations <br /> b. Construction <br />