My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004714
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
500
>
2600 - Land Use Program
>
UP-98-22
>
SU0004714
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2020 1:05:24 PM
Creation date
9/6/2019 11:06:15 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004714
PE
2627
FACILITY_NAME
UP-98-22
STREET_NUMBER
500
Direction
E
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
LATHROP
APN
19119006
ENTERED_DATE
11/18/2004 12:00:00 AM
SITE_LOCATION
500 E LOUISE AVE
RECEIVED_DATE
1/3/1989 12:00:00 AM
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\L\LOUISE\500\UP-98-22\SU0004714\APPL.PDF \MIGRATIONS\L\LOUISE\500\UP-98-22\SU0004714\CDD OK.PDF \MIGRATIONS\L\LOUISE\500\UP-98-22\SU0004714\EH COND.PDF \MIGRATIONS\L\LOUISE\500\UP-98-22\SU0004714\EH PERM.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
695
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT 12 <br /> SAN JOAQUIN COGEN <br /> PLOT FLAN <br /> The attached drawing 30.53-G-100.01 is the proposed plot plan <br /> layout of the San Joaquin CoGen plant. <br /> The access roads within the plant battery limits will be <br /> paved. The personnel access area around the equipment will <br /> be gravel . <br /> All hazardous materials will be curbed or diked to contain <br /> any spills. <br /> The perimeter of the plant will have a six foot chain lino; <br /> security fence. Any hazardous areas where personnel are <br /> restricted such as the switchyard will have additional <br /> security fencing with limited access. <br /> The Power Control Building will be of modular steel <br /> construction and will have the control room, motor control <br /> center , electrical switchgear and station batteries for an <br /> uninterrupted power system (UPS) . <br /> The Administration/Maintenance building will house the <br /> administrative offices and the maintenance shop. <br /> The Fuel Gas supplier area will have the gas supplier <br /> metering equipment , filters and drums to trap liquids and <br /> debris that may be in the incoming gas. <br /> The water tanks will store treated water to maintain a 2q <br /> hour supply. <br />
The URL can be used to link to this page
Your browser does not support the video tag.