Laserfiche WebLink
12/31/1997 14:43 12093340102 MIKE SMITH ENGINEERG PAGE 02 <br /> r <br /> Mike Smith Engineering <br /> 4 North Main Street <br /> Lodi, CA (209) 334-2332 <br /> December 31, 1997 <br /> Attn: Tom C:au <br /> San jruquin County <br /> Community Development Department <br /> 1810 E. Hazelton Ave. <br /> SWItton,CA <br /> Re: Use Permit For. <br /> Wrxxlbndge Community Church <br /> lower Sacramento Rd., <br /> Woodbridge,CA <br /> This is a request for a revision in the dates for beginning work for each phase of the aWvc <br /> referenced project. We would like the dates as follows <br /> Phase I Begins 6-15-98 <br /> Plisse Il Begins 6-15.01 <br /> Phase 111 Begins 6.15-04 <br /> If there ane any s ions or comments please feel frec to call. <br /> Sincerely, <br /> f <br /> Michael W. Smith <br /> Mike Smith Engineering <br /> RCE No. 44$90 <br />