My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0010239
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOWER SACRAMENTO
>
22211
>
2600 - Land Use Program
>
PA-1400174
>
SU0010239
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:34:28 AM
Creation date
9/6/2019 11:09:32 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0010239
PE
2631
FACILITY_NAME
PA-1400174
STREET_NUMBER
22211
Direction
N
STREET_NAME
LOWER SACRAMENTO
STREET_TYPE
RD
City
ACAMPO
Zip
95220-
APN
01314046
ENTERED_DATE
9/30/2014 12:00:00 AM
SITE_LOCATION
22211 N LOWER SACRAMENTO RD
RECEIVED_DATE
9/25/2014 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\L\LOWER SACRAMENTO\22211\PA-1400174\SU0010239\APPL.PDF \MIGRATIONS\L\LOWER SACRAMENTO\22211\PA-1400174\SU0010239\CDD OK.PDF \MIGRATIONS\L\LOWER SACRAMENTO\22211\PA-1400174\SU0010239\EH COND.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONDITIONS OF APPROVAL <br /> PA-1400174 <br /> HOUSLEY/MIKE SMITH ENGINEERING <br /> Site Approval application No. PA-1400174 was approved by the San Joaquin County Community <br /> Development Department on November 17, 2014. The effective date of approval is November 27, 2014. This <br /> approval will expire on May 28, 2016, which is 18 months from the effective date of approval, unless (1) all <br /> Conditions of Approval have been complied with, (2) all necessary building permits have been issued and <br /> remain in force, and (3) all necessary permits from other agencies have been issued and remain in force. <br /> Unless otherwise specified, all Conditions of Approval and Ordinance requirements shall be fulfilled prior to <br /> the establishment of the use and the issuance of any building permits. Those Conditions followed by a <br /> Section Number have been identified as Ordinance requirements pertinent to this application. Ordinance <br /> requirements cannot be modified, and other Ordinance requirements may apply. <br /> 1. COMMUNITY DEVELOPMENT DEPARTMENT(Staff Contact: Mo Hatef, [209]468-8477) <br /> a. BUILDING PERMIT: Submit an "APPLICATION-COMMERCIAL BUILDING PERMIT". The Site Plan <br /> required as a part of the building permit must be prepared by a registered civil engineer or licensed architect. <br /> This Plan must show drainage, driveway access details including gates, on-site parking, landscaping, signs, <br /> existing and proposed utility services, and grading (refer to the "SITE PLAN CHECK LIST'for details). A fee <br /> is required for the Site Plan review. (Development Title Section 9-884) <br /> b. APPROVED USE: This approval is for the expansion of an existing small winery in two phases over ten <br /> years as shown on the site plan dated September 16, 2014. Phase One, building permits to be issued <br /> within eighteen months of the effective date of approval, consists of the construction of a 3,000 square <br /> foot wine storage building. Phase Two, building permits to be issued within ten years of the effective date <br /> of approval, consists of the construction of an additional 3,000 square foot wine storage building. No <br /> marketing events are proposed with this application. (Use Type: Wineries and Wine Cellars—Winery, Small) <br /> These Conditions of Approval are in addition to the Conditions of Approval for Use Permit Application No. <br /> UP-00-02. <br /> c. PRODUCTION CAPACITY: A small winery shall have a minimum production capacity of 201 gallons of wine <br /> per year and a maximum production capacity of 36,000 gallons of wine per year. (Development Title Section <br /> 9-1075.5[a]). <br /> d. CAPITAL FACILITY FEE: This project may be subject to the Capital Facility Fee. If the Capital Facility Fee <br /> is applicable, the County shall collect the fees before the issuance of any building permits. (Development Title <br /> Section 9-1245.2) <br /> e. PARKING: Off-street parking shall be provided and comply with the following. <br /> (1) All winery driveways and maneuvering areas shall be surfaced and permanently maintained with <br /> base material of appropriate depth and chip seal to provide a durable, dust free surface. Bumper <br /> guards shall be provided when necessary to protect adjacent structures or properties (Development <br /> Title Section 9-1015.5[e]). <br /> (2) A minimum of eighteen (18) parking spaces shall be provided as required by UP-00-02. (Development <br /> Title Section 9-1015.9) <br /> The existing parking spaces meet this requirement. <br /> PA-1400174 (SA) Conditions of Approval 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.