Laserfiche WebLink
O <br /> " ' t THOMAS M. GAU P.O.BOX 1810-1810 E.HAZELTON AVENUE <br /> DIRECTOR JtSTOCKTON,CALIFORNIA 95201 <br /> 2 <br /> cq<IkoR?:c J f ( 09)468-3000 FAX(209)468-2999 <br /> www.sjgov.org/pubworks <br /> FRITZ BUCHMAN <br /> DEPUTY DIRECTOR y <br /> _ a <br /> MICHAEL SELLINGw-kmg far -fou RECEIVED <br /> DEPUTY DIRECTOR <br /> JIM STONE ^���/ _ 3 2014 <br /> DEPUTY DIRECTOR <br /> ROGERJANES <br /> BUSINESS ADMINISTRATOR San Joalr_si^ County <br /> Community Development <br /> October 29, 2014 <br /> MEMORANDUM <br /> TO: John L. Funderburg, Principal Planner <br /> Community Development Department <br /> CONTACT PERSON: Mo Hatef <br /> FROM: Alex Chetley,Engineering Services Manager <br /> Development Services Division <br /> SUBJECT: PA-1400174;A Site Approval application to increase the storage area of an existing winery. Phase I <br /> includes the construction of a 3,000 square-foot wine storage building. Phase II,with building <br /> permits to be issued within ten years, includes the construction of an additional 3,000 square-foot <br /> wine storage building. No marketing events and no increase in production, customers, or employees <br /> are proposed with this application; located on the west side of Lower Sacramento Road <br /> approximately one-quarter mile south of Peltier Road, Acampo. (Supervisorial District 4) <br /> PROPERTY OWNER: Arthur J. &Judith A. Housley,Tr. APPLICANT: Mike Smith Engineering <br /> ADDRESS: 22211 N. Lower Sacramento Road, Acampo APN: 013-140-46 <br /> INFORMATION: <br /> The site is not currently located within a Federal Emergency Management Agency Designated Flood Hazard Area. <br /> Lower Sacramento Road has an existing right-of-way width of 80 feet and a planned right-of-way width of 84 feet. <br /> RECOMMENDATIONS: <br /> 1. The Traffic Impact Mitigation Fee shall be required for this application. The fee is due and payable at the time <br /> of building permit application. The fee shall be automatically adjusted July 1 of each year by the Engineering <br /> Construction Cost Index as published by the Engineering News Record. (Resolution R-00-433) <br /> 2. The Regional Transportation Impact Fee shall be required for this application. The fee is due and payable at the <br /> time of building permit application. The fee will be based on the current schedule at the time of payment. <br /> (Resolution R-06-38) <br /> 3. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br />