Laserfiche WebLink
WASTE DISCHARGE REQUIREMENTS ORDER NO. <br /> ALPINE PACKING COMPANY,INC, 14 <br /> WASTEWATER TREATMENT SYSTEM, SAN JOAQUIN COUNTY <br /> 5. If the Discharger can demonstrate to the satisfaction of the Executive Officer that higher BOD <br /> loadings than that specified in Effluent Limitation No. C.2 will not cause or contribute to cause <br /> waste constituents to leach into and degrade underlying groundwater, or cause any other violation <br /> of the terms and conditions of this Order, then this Order may be reopened for consideration of <br /> revision of BOD loading limits. The demonstration shall include the submittal of a technical <br /> -S <br /> report that describes, at a minimum, the results of a field demonstration project conducted over <br /> the course of at least two years on similar soil types as those in the land application area and using <br /> similar wastewater as that described in the Findings. Any proposed field demonstration project <br /> will be regulated under the terms and conditions of separate waste discharge requirements. As <br /> such, at least 120 days prior to conducting the field demonstration project, the Discharger(and/or <br /> other reasonable party) must submit a complete Report of Waste Discharge for the proposed field <br /> demonstration project. <br /> 6. If the Discharger can demonstrate to the satisfaction of the Executive Officer that higher nitrogen <br /> loadings than that specified in Effluent Limitation No. C.1 will not cause or contribute to cause <br /> waste constituents to leach into and degrade underlying groundwater, or cause any other violation <br /> of the terms and conditions of this Order, then this Order may be reopened for consideration of <br /> revision of nitrogen loading limits. The demonstration shall include the submittal of a technical <br /> report that describes, at a minimum, the results of a field demonstration project conducted over <br /> the course of at least two years on similar soil types as those in the land application area and using <br /> similar wastewater as that described in the Findings. Any proposed field demonstration project <br /> will be regulated under the terms and conditions of separate waste discharge requirements. As <br /> such, at least 120 days prior to conducting the field demonstration project, the Discharger(and/or <br /> other reasonable party) must submit a complete Report of Waste Discharge for the proposed field <br /> demonstration project. <br /> 7. In the event of any change in control or ownership of land or waste discharge facilities described <br /> herein, the Discharger shall notify the succeeding owner or operator of the existence of this Order <br /> by letter, a copy of which shall be immediately forwarded to this office. <br /> 8. The Discharger shall submit to the Regional Board on or before each compliance report due date <br /> the specified document, or if appropriate, a written report detailing compliance or noncompliance <br /> with the specific schedule date and task. If noncompliance is reported, then the Discharger shall <br /> state the reasons for noncompliance and shall provide a schedule to come into compliance. <br /> 9. The Discharger shall report promptly to the Regional Board any material change or proposed <br /> change in the character, location, or volume of the discharge. <br /> 10. The Discharger shall report to the Regional Board any toxic chemical release data it reports to the <br /> State Emergency Response Commission within 15 days of reporting the data to the Commission <br /> pursuant to section 313 of the "Emergency Planning and Community Right to Know Act of <br /> 1986." <br /> 11. The Discharger shall use the best practicable cost-effective control technique currently available <br /> to comply with salinity Iimits specified in this order. <br />', C?rojc"FleslSite%Alpine PackinglWDR.do { <br />