Laserfiche WebLink
� r <br /> Conditions of Approval <br /> SA-92-52 <br /> Page 4 <br /> r <br /> 3 b. Obtain a building permit for proposed mobile office. <br /> 5. STATE RECLAMATION BOARD: <br /> a. An encroachment permit for the proposed 8 inch storm <br /> water pipe that would convey runoff to Duck Creek shall <br /> be obtained from that Reclamation Board prior to the <br /> issuance of building permits. <br />