Laserfiche WebLink
i <br /> AIR-COOLED PAD MOUNTED RECTIFIER AIR-COOLED PAD <br /> MOUNTED RECTIFIER <br /> PAD-LOCKABLE LATCH <br /> IDENTIFICATION PLATE <br /> NEW BOLLARD 314-0 CRS CONDUIT W/f-�6 AWG BARE COPPER ° <br /> (TYP OF 2) <br /> SEE D7AIL�\ <br /> CP-2d 1- ORS CONDUIT W/(f)-'4 AWG 7HHN HEADER [:ABLE 70 REC7IFlER POSITIVE TERMINAL <br /> •ercnR6v <br /> ANODE JUN0170N BOX PAD—LOCKABLE <br /> SEE DETAIL I—A LATCH <br /> CSP--19� <br /> LOCKABLE DISCONNECT SWITCH <br /> 2°V GRS CONDUIT W/(VARIES)—J8 AWG ANODE CABLES <br /> I <br /> I <br /> I'd GRS CONDUIT W/(f)-J4 AWG HMWPE DRAIN CABLE&(1)-,J8 AWG TEST CABLE <br /> NEW CONCRETE PAD <br /> SEE DETAIL <br /> 9'DIA G-5 TRAFFIC BOX <br /> 2'6 GRS CONDUIT W/(3)-J8 AWG- THAN, XHHW AC CABLES v <br /> NEW CONCRETE PAD <br /> . SEF DETAIL <br /> ICP-i91 <br /> GRADE f <br /> 2" <br /> \ /� '�\/j/ I I I i I � I f s 4 / • / \ 4 � I I 4 <br /> \ 4 <br /> WARNING 18"(�) /\WARNING TAPE\\ <br /> TAPE e <br /> — — �/ • WARNING TAPE —— <br /> BUSHINGO° 30°(TYP) n <br /> 5/8"x8'GROUND ROD CSCH 40 PVC VC <br /> CONDUIT 7D AC CONDUIT TO AC <br /> PULL BOX PULL BOX <br /> (SEE NOTE 3.) • o (SEE NOTE J.) <br /> 1'0 SCH 40 PVC CONDUIT 210 SCH 40 PVC CONDUIT <br /> TO STRUCTURE TO DEEP ANODE BEDS <br /> (SFE NOTE 3.) (SEE NOTE 3,) <br /> FRONT RIGHT SIDE <br /> NOTES., I <br /> 1. LEAVE SPACE AT BOTTOM OF RECTIFIER ENCLOSURE FOR AN INTERRUPTER. <br /> 2, USE PVC SCHEDULE 40 CONDUIT UNDERGROUND,AND GALVANIZED RIGID STEEL CONDUIT ABOVE GRADE. THE POR17ON OF THE GALVANIZED STFFL CONDUIT, WHICH IS UNDERGROUND BEFORE IT TRANSITIONS TO PVC, SHALL BE PRIMED & TAPE WRAPPED ALONG ENDRE LENGTH WITH HALF-LAP 10-MR POLYEINYLENE TAPE <br /> 3. FOR CABLE TRENCH, SEE DETAIL 2/CP-20. <br /> 4. THE DOOR OF THE RECTIFIER ENCLOSURE SHALL BE FURNISHED AN I.D. PLATT=AS INDICATED IN DETAIL 3/CP-19,AND SHALL ALSO INCLUDE A 10`X14"SIGN, BRADY 64064 OR EQUIVALENT, MARKED 'DANGER HIGH VOLTAGE KEEP OUT". <br /> 5. THE DISCONNECT SWITCH MAY BE LOCATED INSIDE OR OUTSIDE OF THE REC77FIER CABINET. <br /> 1 PAD MOUNTED RECTIFIER INSTALLATION <br /> cP-18xor TO scALE <br /> DEPARTMENT OF MUNICIPAL UTILITIES <br /> `l - CITY OF STOCKTON,CALIFORNIA <br /> �° RECOMMENp�D; <br /> ENGINEERING MANAGER <br /> NO. REVISIONS BY APP DATE DESIGNED UNDER THE DIRECTION OF, SHEET <br /> CATHODIC PRO7�C710I� RE�d3a0�3� 5W�5&FORCEMAIHS <br /> _ jdh corrosion 3-20--2018 ti CP 18 <br /> \I[i DEIARTZ IJ SLIT]$5 <br /> I7GI'_�MRT\.(GNI s I t n t s, i n c. �, 1/} t 0 r:,� �;n i�ry Mow.aMnaeo nu care G xa ca tons � <br /> I�Il IIOl7{3_ ROI{ II_lr E�[l li@1 OF,���(}I'li +{II A,COR.E.No.CR 1035 PE�k5TRATION EICPIRE963o-1� Ep yne 30,10fP <br /> �� -300Nniy 952 1100 cord, FOSS Court, Iril 11 IV LI Il l! �`!J 11 I 1111 LL55 I1 LS :f Ll <br /> Swcklon,G1 951AG DESIGN;IDN DATE:5-3-17 <br /> Ph_':(2M 937-117P'1 Concord, CA 94520 DRAWN,TDH [DATE:6-3-17 <br /> Tel. (925)927-8630 — -- STDCi[TDN,CALIFDRNIR MUNICIPAL UTILITES DEPARTMENT <br /> MUf11AMl YIRSnR q}yR11tlNf CI iECKE[D:MA [DATE:5-3-17 18 of 20 5:ILEI S <br />