Laserfiche WebLink
Kerry Sullivan -�- <br /> COMMUNITY DEVELOPMENT <br /> PA-02-636 <br /> 2. The Traffic Impact Mitigation Fee shall be required for this development. The fee is due <br /> and payable at the time of building permit application. (The fee currently is $177.78 per <br /> additional daily trip-end generated in the Manteca area. The fee shall be automatically <br /> adjusted July 1 of each year by the Engineering Construction Cost Index as published by <br /> the Engineering News Record. <br /> (Resolutions 00-433) <br /> 3. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> Note: An encroachment permit may be required for work within road right-of-way <br /> and shall be issued by Caltrans. <br /> Caltrans has required a traffic study for this project. The traffic study shall be <br /> completed prior to Public Works issuing clearance for the plan check or a <br /> letter from Caltrans stating that the traffic study is no longer needed. <br /> Dedication may be required by Caltrans, and shall be determined if requred at <br /> the time of the encroachment permit. <br /> GK:BN:ar <br /> PICOMMENTS\SA\Yr 2002\PA-02-636 upd <br />