My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0006056_SSNL
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
O
>
120 (STATE ROUTE 120)
>
10800
>
2600 - Land Use Program
>
PA-0600190
>
SU0006056_SSNL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 3:59:59 PM
Creation date
9/8/2019 12:31:57 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
FileName_PostFix
SSNL
RECORD_ID
SU0006056
PE
2632
FACILITY_NAME
PA-0600190
STREET_NUMBER
10800
Direction
E
STREET_NAME
STATE ROUTE 120
City
MANTECA
Zip
95336
APN
22803024
ENTERED_DATE
5/23/2006 12:00:00 AM
SITE_LOCATION
10800 E HWY 120
RECEIVED_DATE
5/23/2006 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\O\HWY 120\10800\PA-0600190\SU0006056\NL_SS STDY.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
%wool <br /> Faddition, <br /> ilding designer/engineer/architect, the plumber, the landscaper, and the wastewater disposal <br /> installer must all coordinate so that proper grades are established and maintained. In <br /> effluent lines should not cross fresh water or electrical lines. If crossing cannot be avoided, <br /> the wastewater lines should cross under fresh water lines and be adequately encased per EHD <br /> guidelines. <br /> Sprinkler irrigation over both disposal areas must be carefully considered so as to not inundate the <br /> filter beds. During the spring and summer months, irrigation should be done intermittently during <br /> the day and/or evening hours. For example, the sprinklers could run for five minutes, six times per <br /> day. Irrigation during the wintertime should be suspended. Run times and number of daily <br /> irrigations should be determined by the landscape contractor. <br /> Another source of nitrate loading can be from the lawn or other landscape-type plants that may be <br /> planted over the filter bed area. It is recommended not to use any nitrogen fertilizer in these areas. <br /> If it is deemed necessary to use them, "slow release"nitrogen fertilizers should be used on the lawns <br /> and/or landscaping to reduce nitrate loading from these areas. <br /> Accurate"as-builts"of the septic system must be supplied to the Environmental Health Department. <br /> All applicable"distance"and "setback"requirements must be strictly followed. <br /> It is imperative to recognize that all septic systems and disposal areas have a lifespan. This lifespan <br /> is unpredictable due to the numerous operational and environmental factors involved. A critical <br /> lifespan issue is controlling the on-site water use as much as possible. This may be accomplished by <br /> using low flow toilets and spring-loaded sink faucets. Restricting water use also includes checking <br /> for water leaks in toilets, dripping faucets, etc. on a regular monthly basis. <br /> 17 <br /> Chesney Consulting <br />
The URL can be used to link to this page
Your browser does not support the video tag.