Laserfiche WebLink
STATE OF CALIFORNIA-BUSINESS,TRANSPORTATION AND HOUSING AGENCY GRAY DAVIS,Governor <br /> DEPARTMENT OF TRANSPORTATION <br /> P.O.BOX 2048(1976 E.CHARTER WAY) <br /> STOCKTON,CA 95201 =`� <br /> TDD(209)948-7981 <br /> (209)948-3975 <br /> February 17, 2000 comm FEB 1 8 200 <br /> Jnr 0 <br /> SJ-120 P.M. 008.840 <br /> San Joaquin County N[ <br /> SA-00-05 <br /> Mr. Kai Luoma <br /> San Joaquin County <br /> Community Development Department <br /> 1810 East Hazelton Avenue <br /> Stockton, CA 95205 <br /> Dear Mr. Luoma: <br /> Thank you for the opportunity to review the Site Approval application to convert an existing <br /> farm produce stand to a farm market. The project site is located on the north side of State Route <br /> 120, 3,200 feet west of Jack Tone Road, east of Manteca. <br /> Transportation Planning has circulated the above referenced project through our normal <br /> interdepartmental review process. Caltrans offers the following comments; <br /> • Caltrans requires dedication to 50' (15.24m) from centerline along the frontage of the <br /> project. <br /> • Paveout to 38' (11.4m) can be deferred at this time. <br /> • A commercial driveway to current Caltrans standards should replace the circular driveway <br /> (#2 and #3). <br /> • The driveway to the west of the circular driveway may remain at this time. <br /> • An Encroachment Permit will be required for this project and other work done within the <br /> State right of way. Please direct the applicant to include the affected portion of the State right <br /> of way in their environmental studies. This avoids the delay of a separate environmental <br /> review for the encroachment permit. You and the applicant should review the need for <br /> cultural resource, biological resource and hazardous waste studies in our right of way. <br /> Review agencies and interest groups frequently challenge Caltrans permits on these issues. <br /> Please provide Caltrans with either (1) appropriate studies done by qualified professional <br /> staff, or (2) rationale for your CEQA determination that these issues are not of concern in the <br /> State right of way. This will expedite our review of the encroachment permit. If engineering <br /> plans or drawings will be part of your permit application, they must be prepared in metric <br /> units. <br /> 609540/Luoma/S1-120P.M.008.840 2/15/00 <br />