Laserfiche WebLink
COUNTY OF SAN JOAQUIN THOMAS R.FLINN <br /> 2 y'•y <br /> y DEPARTMENT OF PUBLIC WORKS DEPUTY DIRECTOR <br /> P.O.BOX 1810-1810 EAST HAZELTON AVENUE MANUEL LOPEZ <br /> - STOCKTON,CALIFORNIA 95201-1810 DEPUTY DIRECTOR <br /> c4.�Fo'a`'�P 209/468 3000p STEVEN WINKLER <br /> FAX:209/468-2999 1��f�) DEPUTY DIRECTOR <br /> HENRY <br /> M .HIRATA MAR 2 0 2000 <br /> OR <br /> March 17, 2000 COMMueitY Development D <br /> epi, <br /> MEMORANDUM <br /> TO: Kerry Sullivan, Deputy Director <br /> Community Development Department <br /> CONTACT PERSON: Kai Luoma <br /> FROM: Gabriel Karam, Senior Civil EngineerG <br /> Public Services Division <br /> SUBJECT: SA-00-05 A SITE APPROVAL APPLICATION TO CONVERT EXISTING FARM <br /> PRODUCE STAND TO A FARM MARKET, LOCATED ON THE NORTH SIDE OF <br /> STATE HIGHWAY ROUTE 120, 3,200 FEET WEST OF JACK TONE ROAD. <br /> (DISTRICT 5). <br /> APPLICANT: Joseph and Susan Giulian APN: 208-170-17 <br /> INFORMATION: <br /> The site is not currently located within a Federal Flood Insurance Administration Designated Flood Hazard Area. <br /> State Highway Route 120 has an existing right-of-way width of 60 feet and a planned right-of-way width as required <br /> by Caltrans. <br /> RECOMMENDATIONS: <br /> 1. Any dedications, improvements,or permits for State Highway Route 120 shall be as required by Caltrans. <br /> 2. The Traffic Impact Mitigation Fee will be required for this development. The fee is due and payable at the <br /> time of building permit application. (The fee currently is $164.32 per additional daily trip-end generated <br /> in the Manteca area. The fee shall be automatically adjusted July 1 of each year by the Engineering <br /> Construction Cost Index as published by the Engineering News Record. <br /> (Resolutions R-90-304, R-91-1025,R-93-167, R-94-179, R-95-650 and R-96-592) <br /> 3. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 4. Verification shall be obtained from the Solid Waste Division (468-3066) that this development has <br /> addressed the items on the attached Waste Plan Format for Development Projects. Final Site Plan is <br /> required upon submittal of verification. <br /> GK:RH:af <br /> PS-00075-AIA <br /> E: Manuel Lopez, Deputy Director/Development <br />