Laserfiche WebLink
i <br /> Kerry Sullivan - -2- <br /> COMMUNITY DEVELOPMENT <br /> PA-03-82 (SA) <br /> 2. The driveway approach shall be improved in accordance with the requirements of San <br /> Joaquin County Standards R-17 prior to issuance of the occupancy pemrit. <br /> (Development Title Section 9-1145.5) <br /> 3. The Traffic Impact Mitigation Fee shall be required for this development. The fee is due <br /> and payable at the time of building permit application. (The fee currently is $164.86 per <br /> additional daily trip-end generated in the Escalon area. The fee shall be automatically <br /> adjusted July 1 of each year by the Engineering Construction Cost Index as published by <br /> the Engineering News Record.) <br /> (Resolutions 00-433) <br /> 4. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> NOTE: A State National Pollutant Discharge Elimination System(NPDES) Construction <br /> Permit Notice of Intent(NOI) shall be filed with the State Water Resources Control <br /> Board (SWRCB) if over one (1) acre of total ground is disturbed. <br /> DTP:SH:ar <br /> P--.KOM,V� TS\SA',NR 2W3TA-0100082.wpd <br />