My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0002891
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
O
>
120 (STATE ROUTE 120)
>
25015
>
2600 - Land Use Program
>
SA-97-34
>
SU0002891
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 4:01:41 PM
Creation date
9/8/2019 12:34:27 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0002891
PE
2633
FACILITY_NAME
SA-97-34
STREET_NUMBER
25015
Direction
E
STREET_NAME
STATE ROUTE 120
City
ESCALON
ENTERED_DATE
11/6/2001 12:00:00 AM
SITE_LOCATION
25015 E HWY 120
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\O\HWY 120\25015\SA-97-34\SU0002891\CDD OK.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROCEDURES FOR PROPERTY DEDICATION TO <br /> CALTRANS <br /> 1. Provide a copy of the vesting document(s) and Title Report (or <br /> Title Guarantee or Subdivision Guarantee) , showing ownership, <br /> and copies of any documents or recorded maps referred to in <br /> the vesting document. In cases where no maps are referred to <br /> in the vesting document, we need copies of any available <br /> Parcel Map, Record of Survey Map, or other maps of record <br /> covering the property from which the dedication is to be made. <br /> 2 . Provide copies of documents and recorded maps cited in any of <br /> the other documents submitted. <br /> 3 . A legal description (tied to a monumented line) of the area to <br /> be dedicated, is prepared by the property owner's Consulting <br /> Engineer or Licensed Land Surveyor, using recorded Parcel Maps <br /> or Record of Survey Maps if available, and submitted to the <br /> Caltrans Right of Way Engineering Department for review. <br /> 4 . Provide a hazardous waste document showing clearance of such <br /> waste on the dedicated parcel, or indemnyifing the State of <br /> California of responsibilty for any waste. <br /> 5 . The legal description is checked. If revisions are necessary, <br /> the legal is revised by the author and returned to Caltrans. <br /> Then the legal description is placed on a Caltrans Deed form, <br /> and returned to the property owner' s Consulting Engineer or <br /> Licensed Land Surveyor, who obtains the required signature(s) * <br /> and proper notorization. The signed and notorized Deed is then <br /> returned to Caltrans. The deed will then be processed for <br /> signature by the District Division Chief of Right of Way and <br /> recording by Caltrans. <br /> 6 . An encroachment permit will not be issued until the deed has <br /> been recorded and a copy of the recorded deed sent back to the <br /> address below. <br /> * After obtaining signature (s) and having it notarized <br /> please send back to Caltrans at this address: <br /> MICHAEL J. WAGNER <br /> Chief, Right-of-Way Engineering <br /> RIGHT OF WAY ENGINEERING <br /> DEPARTMENT OF TRANSPORTATION <br /> P.O. BOX 2048 <br /> STOCKTON, CA 95201 <br /> Rev.:August 15. 1995 <br />
The URL can be used to link to this page
Your browser does not support the video tag.