Laserfiche WebLink
Thomas M. Gau -2- <br /> COMMENTS ON DEVELOPMENTS <br /> SA-98-79 <br /> 3. The driveway approaches shall be improved in accordance with the <br /> requirements of San Joaquin County Standards R-1 7 prior to issuance of the <br /> occupancy permit. <br /> (Development Title Section 9-1 145.5) <br /> 4. The Traffic Impact Mitigation Fee will be required for this development. The <br /> fee is due and payable at the time of building permit application. (The fee <br /> currently is $555 per 1 ,000 gross square foot of building as Manufacturing in <br /> the Escalon area. The fee shall be automatically adjusted July 1 of each year <br /> by the Engineering Construction Cost Index as published by the Engineering <br /> News Record.) <br /> (Resolutions R-90-304, R-91 -1025, R-93-1 67, R-94-1 79, R-95-650 and R- <br /> 96-592) <br /> 5. A copy of the Final Site Plan shall be submitted prior to release of building <br /> permit. <br /> GK:RH:br <br /> PS-9B052.B1 A <br /> E: Manuel Lopez, Deputy Director/Development <br />