Laserfiche WebLink
(1) Fire flow will be provided for proposed buildings by the use of <br /> A. Public water mains(Appendix III-A of the Uniform Fire Code). <br /> B. Static Water Supply(NFPA 1231 of the National Fire Code). <br /> (2) Fire department access roads shall be in accordance with Section 902.2 of the California Fire <br /> Code and the standards adopted by the San Joaquin County Fire Chiefs Association. <br /> (3) A Knox box(key box)shall be installed according to the local fire department's instructions. <br /> (4) Fire extinguishers shall be installed in accordance with California Fire Code, Standard 10-1, <br /> Volume 2. <br /> 2. DEPARTMENT OF PUBLIC WORKS (Staff Contact:Gabriel Karam,468-3000) <br /> a. The Traffic Impact Mitigation Fee will be required for this development. The fee is due and payable <br /> at the time of building permit application. The fee currently is$1,097 per 1,000 gross square feet of <br /> building designated as Service Commercial in the Escalon area. The fee shall be automatically <br /> adjusted July 1 of each year by the Engineering Construction Cost Index as published by the <br /> Engineering News Record. (Resolution R-96-592) <br /> b. A copy of the Final Site Plan shall be submitted prior to the release of building permits. <br /> c. Verification shall be obtained from the Solid Waste Division(468-3066)that this development has <br /> addressed the items on the attached Waste Plan Format for Development Projects. The Final Site <br /> Plan is required upon submittal of verification. <br /> 3. PUBLIC HEALTH SERVICES (Staff Contact: Larry Godinho,468-0330) <br /> a. A soil suitability study/nitrate loading study which indicates that the area is suitable for septic tank <br /> usage must be performed prior to issuance of building permits(Development Title Section 9- <br /> 1105.2[d]). A nitrate loading study is required,and a review fee of$435.00 must be paid at the time <br /> of submittal to the Environmental Health Division. <br /> The sewage disposal system shall comply with the on-site sewage standards of San Joaquin County <br /> prior to approval. A percolation test that meets absorption rates of the manual of septic tank practice <br /> or the EPA Design Manual for on-site wastewater treatment and disposal systems is required for <br /> each parcel. A permit fee of$87.00 per percolation hole is required. <br /> b. The existing private water wells shall be tested for the chemical dibromochloropropane(DBCP)and <br /> nitrates prior to the issuance of building permits. Samples are to betaken and analyzed by a State <br /> approved laboratory. (Development Title Section 9-1115.7) <br /> c. State on revised site plans the maximum number of employees and facility participants the sewage <br /> disposal system is being designed for and that the leach field area will be barricaded so it cannot be <br /> driven over, parked on, or used as a storage area. This leach field area must be used for that <br /> specific purpose only and cannot contain any underground utility lines. (Development Title Section <br /> 9-1110.4[c][5]). <br /> San Joaquin County UP-00-22\California Milk Market <br /> Community Development Page 8 <br />