My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004091
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
O
>
120 (STATE ROUTE 120)
>
800
>
2600 - Land Use Program
>
QX-00-0001
>
SU0004091
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 4:01:42 PM
Creation date
9/8/2019 12:35:05 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004091
FACILITY_NAME
QX-00-0001
STREET_NUMBER
800
Direction
E
STREET_NAME
STATE ROUTE 120
City
LATHROP
ENTERED_DATE
5/12/2004 12:00:00 AM
SITE_LOCATION
800 E HWY 120
RECEIVED_DATE
2/23/2000 12:00:00 AM
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\O\HWY 120\800\QX-00-01\SU0004091\CORRESPOND.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
213
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
the excavation shall at not time be closer to the property line than a line projected on a <br /> slope of one (1) to one (1) from the property line to the toe of slope. <br /> (5) Final Slopes. Final cut and/or fill slopes shall not exceed two (2) feet horizontal to one <br /> (1) foot vertical, except as specified below: <br /> A. Final slopes to a maximum of one and one-half(1 1/2) feet horizontal to one (1) <br /> foot vertical may be maintained when site-specific geologic and engineering <br /> analysis demonstrate through a slope stability analysis that the proposed final <br /> slopes will have a minimum slope stability factor of safety as required in Section 9- <br /> 1415.2(k)(4), while demonstrating suitability for the proposed end use and <br /> protecting against erosion (by means of revegetation or other methods approved <br /> by Development Services Division). <br /> (6) Fill Slopes. Fill slopes shall be constructed consistent with recommendations from a <br /> qualified civil/geotechnical engineer based upon site-specific geologic conditions; <br /> k. FENCING: Fencing four (4) feet in height consisting of not less than three (3) strands of <br /> barbed wire, or an approved equivalent,shall be placed around the excavation area where <br /> slopes steeper than two (2) feet horizontal to one (1) foot vertical are maintained. Six (6) <br /> foot high security fencing or an approved equivalent shall be required where slopes <br /> steeper than two (2) feet horizontal to one (1) foot vertical are created, if the proximity of <br /> such slopes to residential uses or other uses involving a concentration of people so <br /> warrants. (Development Title Section 9-1415.3[1]) <br /> I. SCREENING AND LANDSCAPING: Screening consistent with Chapter 9-1020 is <br /> required. (Development Title Section 9-1415.3[m]) <br /> (1) A landscaped berm is required along Madruga Road during the life of the quarry. <br /> Adequate setback for maintenance shall be required and sight distance at road <br /> intersections shall not be impaired. <br /> m. PONDING: All water utilized in the plant operation shall be disposed of behind a closed <br /> dike. (Development Title Section 9-1415.3[n]) <br /> n. EXCAVATION/RECLAMATIONSCHEDULE The reclamation plan shall show the phases <br /> of excavation. Reclamation on one phase of an excavation shall be initiated prior to the <br /> start of the next excavation phase. The final reclamation of any phase of excavation shall <br /> be completed within two years of the commencement of the reclamation process. <br /> Excavation shall be limited so that at any point of time a maximum of one phase is being <br /> reclaimed while one phase is being excavated. (Development Title Section 9-1415.3[o]) <br /> o. TIME LIMITATION: The Quarry Excavation Permit shall remain in effect as long as the <br /> excavation continues in compliance with the approved Permit. Excavation activities shall <br /> be completed within four (4) years of the approval of the Quarry Excavation Application. <br /> Reclamation shall be completed within one (1) year of the completion of the excavation. <br /> (Development Title Section 9-1415.3[p]) <br /> p. ANNUAL INSPECTION REPORTS: Annual inspections of the excavation shall be <br /> conducted by the County to ensure compliance with the conditions of the permit and the <br />
The URL can be used to link to this page
Your browser does not support the video tag.