Laserfiche WebLink
DETAILS <br /> STATUS:ANNUAL WORKPLAN-ACTIVE SITE <br /> STATUS DATE:01/10/1985 <br /> LEAD AGENCY:DEPT OF TOXIC SUBSTANCES CONTROL <br /> GROUNDWATER CONTAMINATION CONFIRMED <br /> ALTERNATE NAME(S):MARLEY COOLING TOWER COMPANY <br /> ALTERNATE ADDRESS: 150 N SINCLAIR AVE,STOCKTON,95215 <br /> ALTERNATE ADDRESS: 150 N.SINCLAIR AVENUE,STOCKTON,95202 <br /> BACKGROUND:Marley Cooling Tower Company(MCTC)manufactures wood components for cooling towers. The site is located <br /> in Stockton and is surrounded by a high school, residences and commercial establishments. Wood is pressure treated with <br /> preservative solutions. MCTC began operation in 1966 using a chromated copper arsenic solution. The solution was changed to an <br /> acid copper chromate in 1982. The MCTC site covers an area of approximately 30 acres. The facility is divided into 2 distinct <br /> sections:the North and South Yards.The South Yard is used for milling and fabrication of un-treated wood and does not generate <br /> products or wastes containing wood treatment chemicals. Limitied areas of the South Yard were used for the temporary storage of <br /> treated wood,which will be remediated as part of the soils RA.The North Yard contains a wood treatment facility(retort),treated <br /> wood storage areas,and a stormwater and groundwater treatment system. Soils and groundwater contamination predominantly result <br /> from North Yard wood treating activities. Hexavalent chromium (Cr) levels in the groundwater have exceeded federal and state <br /> drinking water standards under and downgradient from the MCTC site. One municipal water well was removed from service. <br /> Municipal wells and other monitoring wells are sampled and monitored regularly to identify the rate of Cr movement. Remedial <br /> actions in the June 1990,RAP were divided into 4 RAs/OUs:surface soils;pipes and culverts;subsurface soils beneath retorts;and <br /> groundwater.The stormwater retention pond,also located in the North Yard,was closed with an approved RCRA Closure Plan. The <br /> closure involved fixation and encapsulation of metal contaminated waste. MCTC has completed RAs for surface soils, pipes and <br /> culverts. The retort pit has been backfilled and capped. The groundwater extraction and treatment system is operating. In 2003, <br /> nearly 2000 pounds of chromium were removed from groundwater. An insitu calcium polysulfidc solution injection pilot study is <br /> underway to determine the efficiency of reducing the hexavalent chromium in groundwater to the unsoluble trilucent state. <br /> ACTIVITIES:ACTIVITY:USE,IORSE,FFA,FFSRA,VCA,EA COMPLETION DATE: 12/23/1984 <br /> ACTIVITY:SITE SCREENING COMPLETION DATE:02/20/1987 <br /> ACTIVITY:USE,IORSE,FFA,FFSRA,VCA,EA COMPLETION DATE:03/33/1988 <br /> ACTIVITY:REMEDIAL INVESTIGATION/FEASIBILITY STUDY COMPLETION DATE:02!22/1990 <br /> ACTIVITY:REMEDIAL ACTION PLAN/RECORD OF DECISION COMPLETION DATE:06/63/1990 <br /> ACTIVITY:DESIGN COMPLETION DATE: 11/13/1990 <br /> ACTIVITY:DESIGN COMPLETION DATE: 11/13/1990 <br /> ACTIVITY:DESIGN COMPLETION DATE:03/31/1991 <br /> ACTIVITY:DESIGN COMPLETION DATE:03/31/1991 <br /> ACTIVITY:REMOVAL ACTION COMPLETION DATE:08/80/1991 <br /> REMOVAL OF DEBRIS AND PRESSURE WASHING OF PIPES. REMOVAL OF CONTAMIN-ATED SOILS FROM <br /> ISOLATED AREAS OF CULVERTS.BULK OF WORK DONE 11/90-4/91,WITH SOME RESIDUAL WORK DONE 8/91. <br /> ACTIVITY:REMOVAL ACTION COMPLETION DATE:08/80/1991 <br /> SURFACE SOIL REMOVAL. <br /> ACTIVITY:REMOVAL ACTION COMPLETION DATE:03/30/1992 <br /> GW EXTRACT&TREAT INSTALL ADDITIONAL EXTRACTION WELLS AND PIPINGNECESSARY TO CAPTURE AND <br /> TRANSPORT CONTAMINATED GW TO MARLEY'S ON-SITETREATMENT PLANT.UPGRADE PLANT FROM 250 TO 500 <br /> GPM CAPACITY. <br /> ACTIVITY:LONG-TERM SITE STABILIZATION CERTIFICATION COMPLETION DATE:03/30/1992 <br /> ACTIVITY:REMOVAL ACTION COMPLETION DATE:06/61/1992 <br /> INSTALLATION OF INJECTION AND EXTRACTION WELLS FOR SOIL FLUSHINGSYSTEM. <br /> ACTIVITY:CERTIFICATION <br /> ACTIVITY:OPERATION&MAINTENANCE <br /> ACTIVITY:DESIGN COMPLETION DATE:08/80/1997 <br /> ACTIVITY:REMEDIAL ACTION(RAP REQUIRED) COMPLETION DATE:03/32/1998 <br /> IMPERMEABLE CAP CONSTRUCTED OVER RETORT PIT AREA. <br /> ACTIVITY:DEED RESTRICTIONS COMPLETION DATE:03/32/2002 <br /> ACTIVITY:USE,IORSE,FFA,FFSRA,VCA,EA COMPLETION DATE:02/21/2002 <br /> ACTIVITY:REMEDIAL ACTION PLAN/RECORD OF DECISION <br /> ACTIVITY:DEED RESTRICTIONS COMPLETION DATE:02/22/2004 <br /> COMMENTS: <br /> DATE:01/10/1985 COMMENTS:This is the date the site was first listed pursuant to section 25356. <br /> DATE:02/20/1987 COMMENTS:Site Screening Done. <br /> DATE:02/21/2002 COMMENTS:OM-Operation and Maintenance of site. <br /> DATE: 03/30/2004 COMMENTS: A COVENANT FOR AN ENVIRONMENTAL RESTRICTION AND DECLARATION OF <br /> EASEMENT WAS RECORDED ON FEBRUARY 20,2004 IN THE COUNTY OF SAN JOAQUIN. T141S DEED RESTRICTION <br /> AND EASEMENT WAS FOR PROPERTY TOTALING APPROXIMATELY 14.15 ACRES SPECIFICALLY DESCRIBES AS <br /> COUNTY ASSESSOR'S PARCEL NUMBER 159-020-10 COMMONLY REFERRED TO AS THE SOUTH YARD. PROTECTED <br /> ACTIVITIES INCLUDE MEASURES TO PROTECT THE GROUNDWATER EXTRACTION AND TREATMENT FACILITIES. <br /> RESTRICTED ACTIVITIES INCLUDE PROHIBITION FROM CERTAIN USES WATER EXTRACTED FROM THE GROUND. <br /> EASEMENTS ALLOW FOR THE CONTINUED OPERATION AND MAINTENANCE OF THE REMEDIATION SYSTEM. <br /> DATE:03/32/2002 COMMENTS:DEED-Deed Restriction ofsite. <br /> DATE:03/32/1998 COMMENTS:RMDL/SOIL--IMPERMEABLE CAP CONSTRUCTED OVER RETORT PIT AREA. <br /> DATE: 04/40/1991 COMMENTS: Removal Action#I: Surface soil removal. Removal Action#2: Pipes and culverts, removal of <br /> debris and pressure washing of pipes,removal of contaminated soils from isolated areas of culverts. <br /> Copyright©2005,First American Commercial Real Estate Services,Inc.All rights reserved. www.RecCheck.com <br /> (800)377-2430 <br /> 15 <br />