Laserfiche WebLink
OVIN <br /> �o .co COUNTY OF SAN JOAQUIN THOMAS R.FLINN <br /> DEPARTMENT OF PUBLIC WORKS DEPUTY DIRECTOR <br /> y: <br /> P.O.BOX 1810- 1810 EASE HAZELTON AVENUE MANUEL LOPEZ <br /> STOCKTON,CALIFORNW 95201-1810 DEPUTY DIRECTOR <br /> C� •. P 209/468-3000 STEVEN WINKLER <br /> FAX:209/468-2999 DEPUTY DIRECTOR <br /> HENRY M. HIRATA <br /> DIRECTOR <br /> March 18, 1999 <br /> M E M O R A N D U M <br /> TO: Thomas M. Gau, Senior Civil Engineer <br /> Community Development Department <br /> CONTACT PERSON: Kai Luoma <br /> FROM: Gabriel Karam, Senior Civil EngineerG K <br /> Public Services Division <br /> SUBJECT: SA-99-12 A SITE APPROVAL PREAPPLICATION FOR HOME <br /> OCCUPATION INTERNET SALES SITE APPROVAL, LOCATED ON THE <br /> SOUTH SIDE OF ORCHARD ROAD, 1, 300 FEET EAST OF DUSTIN <br /> ROAD, NORTHWEST OF LODI . (DISTRICT 4) . <br /> APPLICANT: Allan Polinsky APN: 017-120-04 <br /> INFORMATION: <br /> The site is not currently located within a Federal Flood Insurance <br /> Administration Designated Flood Hazard Area. <br /> Dustin Road has an existing right-of-way width of 40 feet and a <br /> planned right-of-way width of 50 feet. South Orchard Road has an <br /> existing right-of-way width of 25 feet south of center line and a <br /> planned right-of-way width of 50 feet_ <br /> RECOMMENDATIONS: <br /> 1 . Encroachment permit shall be required for work within road <br /> right-of-way. <br /> (Development Title Sections 9-1145.4 and 9-1145 . 5) <br /> 2 . The driveway approach shall be improved in accordance with the <br /> requirements of San Joaquin County Standards R-17 prior to <br /> issuance of the occupancy permit. <br /> (Development Title Section 9-1145.5) <br /> 3 . The Traffic Impact Mitigation Fee will be required for this <br /> development. The fee is due and payable at the time of Final Site <br /> Plan approval . (The fee currently is $1, 429 per 1, 000 gross <br /> square foot of converted building as Office in the Lodi area. <br /> The fee shall be automatically adjusted July 1 of each year by the <br /> Engineering Construction Cost Index as published by the <br /> Engineering News Record. ) <br /> (Resolutions R-90-304, R-91-1025, R-93-167, R-94-179, R-95-650 and <br /> R-96-592) <br /> 4 . A copy of the Final Site Plan shall be submitted prior to release <br /> of building permit. <br /> GK:RH:br <br /> PS-9C136.B1C <br /> E: Manuel Lopez, Deputy Director/Development <br />