Laserfiche WebLink
APPLICATION �, COMMERCIAL BUILDING PERMIT <br /> �'. SAN JOAQUIN COUNTY COMMUNITY DEVELOPMENT DEPARTMENT <br /> 1810 E. HAZELTON AVENUE, STOCKTON CA 95205 <br /> BUSINESS PHONE: 209 468- 121 <br /> �rF a ( ) 3 <br /> INSPECTION REQUEST-24 HOUR RECORDER: (209)468-3165 <br /> PERMIT NO. <br /> THIS PORTION OF THE APPLICATION MUST BE COMPLETELY FILLED OUT BY THE APPLICANT <br /> IN ORDER TO APPLY FOR PERMITS REQUIRED TO BUILD A COMMERCIAL STRUCTURE. <br /> Scope of Work: <br /> Site Address: <br /> - I <br /> OWNER NAME AND ADDRESS APPLICANT NAME AND ADDRESS <br /> Name: _ Name: <br /> Address: Address: ? 1 <br /> City: State: City: State: <br /> ZIP: Ph:{ O n 2 ZIP: Ph:{ ) <br /> CONTRACTOR INFORMATION Ph:( ) <br /> Lic.No: Company Name: --- - - - <br /> Address: City: St: ZIP: <br /> DESIGNER INFORMATION Ph:( ) _ <br /> Lic.No: Company Name: <br /> Address: u. City: St zip: 3 <br /> BUSINESS INFORMATION Business Owner: _ <br /> Business Name(DBA): Mailing Address: <br /> CHECKLIST <br /> THE FOLLOWING INFORMATION AND DOCUMENTATION MUST BE SUBMITTED TO DEVELOPMENT Chock <br /> SERVICES BEFORE YOUR APPLICATION CAN BE PROCESSED. -off <br /> 1. One completed application for a Cornmercial Building Permit. <br /> 2. Three complete sets of construction drawings prepared by an architect or engineer. (NOTE: All sheets of the working <br /> drawings must be stamped and wet signed prior to issuance of permit.) The plans must include: <br /> • Site plan. (NOTE: See the Site Plan Check List regarding requirements for the Site Plan.) <br /> • Structural plans. <br /> • A complete floor plan,including room usage, exiting plan and complete dimensions. (NOTE: For remodels and <br /> additions,the existing and proposed floor plans must be shown in their entirety.) <br /> • Plumbing and mechanical plans,including ventilation. <br /> • Electrical plans,including a complete one-line diagram of the service and feeders. <br /> • Disabled Access compliance, <br /> 3. Two sets of structural calculations,stamped and signed with a wet signature. <br /> 4. Two sets of complete construction specificabons. <br /> 5. If prefabricated trusses are included in the scope of work,two sets of the following are required: <br /> • Complete truss layout designating each type of truss to be used. <br /> • Engineered truss plans and calculations which are cross-referenced to the truss layout plan. <br /> • Lateral bracing plans. <br /> • Details of any special features such as girder trusses, hangers between interconnected trusses,connections <br /> between trusses and beams,etc. <br /> • A letter signed by the responsible engineer or architect,stating that he/she has reviewed and approved the truss <br /> calculations and drawings,or either a shop approval stamp and signature or the responsible engineer's or architect's <br /> stamp and signature. <br /> 6. Two sets of non-residential energy calculations wlth all required forms imprinted on the drawings. <br /> 7. One extra copy of the floor plan. Section 72 of the Revenue and Taxation Code now requires a copy of a complete floor <br /> plan of the proposed work to be given to the County Assessor. <br /> 8. One extra site plan to be given to the Department of Public Works at the time of Building Permit application. <br /> 9. One copy of a completed Hazardous Materials Disclosure Survey form is required if the building permit application does <br /> not require discretionary approval(e.g.,Use Permit oSite Approval), Surveyform is attached. <br /> 10. Permit Deposit <br /> F:84ALn1+cu4AN00U wewwr env-COUMERCIAL DOC F"01M(aFMW 103D=! Page 1 of 5 0 7 0 <br />