Laserfiche WebLink
Environmental ■ Facilities ■ Geotechnical ■ Materials <br /> Major Department Store Commercial Retail Portfolio: Environmental team lead for evaluating environmental site conditions and due <br /> diligence review,including overseeing Phase I Environmental Site Assessments and Phase II Environmental Site Investigations for over <br /> thirty retail facilities with automotive maintenance across California. Findings from subsurface investigations were used to support <br /> regulatory closure of select facilities to facilitate a real estate transaction across the United States. <br /> Industrial Facility — Land-use Change/Private School, Los Angeles, CA: Environmental consulting services including Phase I <br /> Environmental Site Assessments (ESA) due diligence support, subsurface investigation actNities to evaluate environmental media <br /> including soil, soil gas and indoor/ outdoor air. Services included a land-use change from an industrial facility to a private school. <br /> Prepared environmental investigation reports,regulatory interaction,corrective action design for indoor air mitigation,and work plan for <br /> management of environmental media. <br /> Retail Shopping Center—Former Dry Cleaners Facility—DTSC, Fremont,CA: Conducted extensive site investigation activities to <br /> evaluate the magnitude and extent of chlorinated solvents identified in the vicinity of a former dry cleaners facility,including an evaluation <br /> of groundwater,soil, soil-gas and indoor vapors as a result of a chlorinated solvent plume. Project responsibilities consisted of direct <br /> support and interaction with client,client legal team and DTSC representatives to manage the closure process,including the preparation <br /> of work plans and environmental investigation reports,risk-based human health evaluation,and response actions. <br /> Underground Storage Tank Assessment and Monitoring —West Los Angeles, CA: Assisted property owner with the regulatory <br /> closure of former underground storage tank(UST)site located in West Los Angeles, California. The project scope included historical <br /> research of past site use and site characterization, including soil, groundwater and soil gas assessments, followed by groundwater <br /> monitoring until closure was achieved. <br /> Automated Fuel Dispensing Facilities — Camp Pendleton, California: Project scope included environmental and geotechnical <br /> investigations at six fueling existing/proposed facilities within Camp Pendleton,California.The project consisted of construction of new <br /> buildings,canopies,pavements, retaining walls,slopes,and installation of underground storage tanks(USTs),and other site facilities. <br /> Served as the environmental group leader. <br /> Emerson College, Hollywood, California: Conducted comprehensive investigation and assisted the client through enrolling and <br /> interacting with the LAFD regarding USTs found during construction activities. Provided construction management oversight to manage <br /> impacted soils and assisted the client in waste disposition, permitting and regulatory compliance interaction. A total of 45,000 cubic <br /> yards of soil was removed from the site and disposed at an off-site facility,prior to the construction of a mid-rise school complex.Support <br /> services allowed for significant savings in construction,on an expedited timeline in concert with the construction schedule. <br /> Los Angeles Unified School District(LAUSD Sites): Managed soil characterization for export/import soils for over nine Los Angeles <br /> Unified School District(LAUSD)sites. Prepared Sample Strategy Plans(SSP)for stockpiled and in-place soils,oversaw the sampling, <br /> and prepared soil certification reports under the supervision of a professional geologistfor submittal to the LAUSD Office of Environmental <br /> Health. <br /> Newton Plastics,Newton,NJ: Managed the removal of two 12,000-gallon(solvents&gasoline containing)USTs from a plastic products <br /> manufacturing facility as a part of transaction deal. Project tasks included,work plan preparation, regulatory officials interface, client <br /> contact/coordination,oversight of removal activities,and report preparation. No further action letter from NJDEP was obtained for the <br /> client. The property value was retained for the client with our consulting services. <br /> Eagle Electric, Queens, NY: Responsibilities were to manage the cleanup of former Coal storage rooms in basement of a landmark <br /> building in Queens,NY. The cleanup activities included,hauling of approximately 425 tons of Class N-1 Hazardous materials,managed <br /> and ensured safety of eightto twelve crew,handling of waste manifests,and coordination fortransportation/disposal and client interface. <br /> AROL Chemicals,Newark,NJ: Managed Phase I and Phase II ESA of chemical manufacturing facility. Soope of Phase II ESA included, <br /> the removal of three 12,000-gallon USTs,excavation and disposal of impacted sails. <br /> lrerracon <br />