|
Environmental ■ Facilities ■ Geotechnical ■ Materials
<br /> Major Department Store Commercial Retail Portfolio: Environmental team lead for evaluating environmental site conditions and due
<br /> diligence review,including overseeing Phase I Environmental Site Assessments and Phase II Environmental Site Investigations for over
<br /> thirty retail facilities with automotive maintenance across California. Findings from subsurface investigations were used to support
<br /> regulatory closure of select facilities to facilitate a real estate transaction across the United States.
<br /> Industrial Facility — Land-use Change/Private School, Los Angeles, CA: Environmental consulting services including Phase I
<br /> Environmental Site Assessments (ESA) due diligence support, subsurface investigation actNities to evaluate environmental media
<br /> including soil, soil gas and indoor/ outdoor air. Services included a land-use change from an industrial facility to a private school.
<br /> Prepared environmental investigation reports,regulatory interaction,corrective action design for indoor air mitigation,and work plan for
<br /> management of environmental media.
<br /> Retail Shopping Center—Former Dry Cleaners Facility—DTSC, Fremont,CA: Conducted extensive site investigation activities to
<br /> evaluate the magnitude and extent of chlorinated solvents identified in the vicinity of a former dry cleaners facility,including an evaluation
<br /> of groundwater,soil, soil-gas and indoor vapors as a result of a chlorinated solvent plume. Project responsibilities consisted of direct
<br /> support and interaction with client,client legal team and DTSC representatives to manage the closure process,including the preparation
<br /> of work plans and environmental investigation reports,risk-based human health evaluation,and response actions.
<br /> Underground Storage Tank Assessment and Monitoring —West Los Angeles, CA: Assisted property owner with the regulatory
<br /> closure of former underground storage tank(UST)site located in West Los Angeles, California. The project scope included historical
<br /> research of past site use and site characterization, including soil, groundwater and soil gas assessments, followed by groundwater
<br /> monitoring until closure was achieved.
<br /> Automated Fuel Dispensing Facilities — Camp Pendleton, California: Project scope included environmental and geotechnical
<br /> investigations at six fueling existing/proposed facilities within Camp Pendleton,California.The project consisted of construction of new
<br /> buildings,canopies,pavements, retaining walls,slopes,and installation of underground storage tanks(USTs),and other site facilities.
<br /> Served as the environmental group leader.
<br /> Emerson College, Hollywood, California: Conducted comprehensive investigation and assisted the client through enrolling and
<br /> interacting with the LAFD regarding USTs found during construction activities. Provided construction management oversight to manage
<br /> impacted soils and assisted the client in waste disposition, permitting and regulatory compliance interaction. A total of 45,000 cubic
<br /> yards of soil was removed from the site and disposed at an off-site facility,prior to the construction of a mid-rise school complex.Support
<br /> services allowed for significant savings in construction,on an expedited timeline in concert with the construction schedule.
<br /> Los Angeles Unified School District(LAUSD Sites): Managed soil characterization for export/import soils for over nine Los Angeles
<br /> Unified School District(LAUSD)sites. Prepared Sample Strategy Plans(SSP)for stockpiled and in-place soils,oversaw the sampling,
<br /> and prepared soil certification reports under the supervision of a professional geologistfor submittal to the LAUSD Office of Environmental
<br /> Health.
<br /> Newton Plastics,Newton,NJ: Managed the removal of two 12,000-gallon(solvents&gasoline containing)USTs from a plastic products
<br /> manufacturing facility as a part of transaction deal. Project tasks included,work plan preparation, regulatory officials interface, client
<br /> contact/coordination,oversight of removal activities,and report preparation. No further action letter from NJDEP was obtained for the
<br /> client. The property value was retained for the client with our consulting services.
<br /> Eagle Electric, Queens, NY: Responsibilities were to manage the cleanup of former Coal storage rooms in basement of a landmark
<br /> building in Queens,NY. The cleanup activities included,hauling of approximately 425 tons of Class N-1 Hazardous materials,managed
<br /> and ensured safety of eightto twelve crew,handling of waste manifests,and coordination fortransportation/disposal and client interface.
<br /> AROL Chemicals,Newark,NJ: Managed Phase I and Phase II ESA of chemical manufacturing facility. Soope of Phase II ESA included,
<br /> the removal of three 12,000-gallon USTs,excavation and disposal of impacted sails.
<br /> lrerracon
<br />
|