Laserfiche WebLink
=mac° MINOR SUBDIVISION <br /> SAN JOAQUIN COUNTY COMMUNITY DEVELOPMENT DEPARTMENT <br /> APPLICATION PROCESSING STEPS (Continued) <br /> STEP 4 CONDITIONS AND ADDITIONAL PERMITS <br /> • PARCEL MAP Unless waived, a parcel map must be approved by the County Surveyor within 60 months of approval <br /> of the tentative map. <br /> • CONDITIONS The staff will send you the final action and if it is approved it will list conditions,by department that must <br /> be met before you can file a parcel map. <br /> • IMPROVEMENT As part of the Parcel Map,Improvement Plan are sometimes required. They are engineered plans <br /> PLANS showing sewer,water,drainage,grading,frontage improvements,roads,street lighting. Facilities and <br /> Landscaping. <br /> • ENCROACHMENT Encroachment Permits must be acquired from the Public Works Department for any work performed <br /> PERMITS within the road right of way. If the project fronts on-a-statehighway these permits are obtained from <br /> Caltrans <br /> • SANITATION AND Projects that will utilize on-site sanitation disposal and/or on-site wells,must obtain permits from the <br /> WELL PERMITS Environmental Health Division. <br /> • BUILDING PERMITS If the project involves construction,a Building Permit must be approved prior to commencement of <br /> work. <br /> • SOIL SUITABILITY A Soil Suitability Study may be required to determine the suitability of the soil to support a septic <br /> system. <br /> • OTHER PERMITS Frequently other local,state and/or federal agencies will require permits for land use projects(e.g.Air <br /> Pollution Control District, Regional Water Quality Control Board or the Sheriffs Office). The Community <br /> Development Department will identify additional permits we are aware of that may be required for your <br /> project. <br /> F:\DEVSVS\Planning Applkallon FornnsWilnor Subdivision(Rev 2-1-11) Page 2 of 9 <br />