Laserfiche WebLink
Thomas M. Gau -2- <br /> COMMENTS ON DEVELOPMENTS <br /> GP-99-05, ZR-99-05 AND UP-99-12 <br /> ZR-99-05 <br /> For future development, services shall be provided in accordance with "Division 11: <br /> Infrastructure Standards and Requirements" of the San Joaquin County Development <br /> Title. <br /> UP-99-12 <br /> 1 . Encroachment permit shall be required for work within road right-of-way. <br /> (Development Title Sections 9-1145.4 and 9-1145.5) <br /> 2. The driveway approach shall be improved in accordance with the requirements of <br /> San Joaquin County Standards R-17 prior to issuance of the occupancy permit. <br /> (Development Title Section 9-1145.5) <br /> 3 The Traffic Impact Mitigation Fee will be required for this development. The fee is <br /> due and payable at the time of building permit application. (The fee currently is <br /> $156.25 per additional daily trip-end generated in the Lodi area. The fee shall be <br /> automatically adjusted July 1 of each year by the Engineering Construction Cost <br /> Index as published by the Engineering News Record.) <br /> (Resolutions R-90-304, R-91-1025, R-93-167, R-94-179, R-95-650 and R-96-592) <br /> 4. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> GK:RH:gn <br /> PS-9G037 G I G <br /> E: Manuel Lopez, Deputy Director/Development <br />