Laserfiche WebLink
APPLICATION - COMMERCIAL BUILDING PERMIT <br /> SAN JOAQUIN COUNTY COMMUNITY DEVELOPMENT DEPARTMENT <br /> 1810 E. HAZELTON AVENUE, STOCKTON CA 95205 <br /> BUSINESS PHONE: (209)468-3121 <br /> INSPECTION REQUEST-24 HOUR RECORDER: (209)468-3165 <br /> PERMIT NO. <br /> THIS PORTION OF THE APPLICATION MUSS'BE COMPLETELY FILLED OUT BY THE APPLICANT <br /> IN ORDER TO APPLY FOR PERMITS REQUIRED TO BUILD A COMMERCIAL STRUCTURE. I <br /> Scope of Work: //�J {0�U %1 �/ C -11-e- <br /> Site Address: <br /> OWNER NAME AND ADDRESS APPLICANT NAME AND ADDRESS <br /> Name: 77&C4 nucS'C�.�j Name: ) ✓ C' <br /> Address: - t Z c-o ( PIC Allri 1216 , Address: 13 7 C) tj <br /> City: State: A City: v State: <br /> ZIP: Ph:( ) ZIP: `'l.0 Ph:('Ml 333 O L <br /> CONTRACTOR INFORMATION Ph:(Ic-) 33 3 - ac/o4 <br /> Lic. No: I Company Name: 0 V\. ro v /V L 1_/VL_ <br /> Address: d City: kox I St: C R ZIP: <br /> DESIGNER INFORMATION _ Ph: _Z33Z <br /> Lic. No: Company Name: AA*--(- <br /> Address: U',, S City: UC2. 1 St: ZIP: (� <br /> BUSINESS INFORMATION IBusiness Owner: od ire <br /> Business Name(DBA): 1����C ��,��� �`, .. (�,l,,r Mailing Address: <br /> C ECKLIST <br /> THE FOLLOWING INFORMATION AND DOCUMENTATION MUST BE SUBMITTED TO DEVELOPMENT Check <br /> SERVICES BEFORE YOUR APPLICATION CAN BE PROCESSED. off <br /> 1. One completed application for a Commercial Building Permit. <br /> 2. Three complete sets of construction drawings prepared by an architect or engineer. (NOTE: All sheets of the <br /> working drawings must be stamped and wet signed prior to issuance of permit) The plans must include: <br /> • Site plan. (NOTE: See the Site Plan Check List regarding requirements for the Site Plan.) <br /> • Structural plans. <br /> • A complete floor plan, including room usage,exiting plan and complete dimensions. (NOTE: For <br /> remodels and additions,the existing and proposed floor plans must be shown in their entirety.) <br /> • Plumbing and mechanical plans,including ventilation. <br /> • Electrical plans,including a complete one-line diagram of the service and feeders. <br /> • Disabled Access compliance. <br /> 3. Two sets of structural calculations,stamped and signed with a wet signature. <br /> 4. Two sets of complete construction specifications. <br /> 5. If prefabricated trusses are included in the scope of work,two sets of the following are required: <br /> • Complete truss layout designating each type of truss to be used. <br /> • Engineered truss plans and calculations which are cross-referenced to the truss layout plan. <br /> • Lateral bracing plans. <br /> • Details of any special features such as girder trusses,hangers between interconnected trusses, <br /> connections between trusses and beams,etc. <br /> • A letter signed by the responsible engineer or architect,stating that he/she has reviewed and approved <br /> the truss calculations and drawings,or either a shop approval stamp and signature or the responsible <br /> engineer's or architect's stamp and signature. <br /> 6. Two sets of non-residential energy calculations with all required forms imprinted on drawings. <br /> 7. One extra copy of the floor plan. Section 72 of the Revenue and Taxation Code now requires a copy of a <br /> complete floor plan of the proposed work to be given to the County Assessor. <br /> 8. One extra site plan to be given to the Department of Public Works at the time of Building Permit application. <br /> 9 One copy of a completed Hazardous Materials Disclosure Survey form is required if the building permit <br /> application does not require discretion approval(e.g.,Use Permit or Site Approval). Surve form is attached. .� <br /> 10. Permit-Deposit <br /> APPLICANT: ONLY THE OWNER OF THE PROPERTY ORA LICENSED CONTRACTOR`MAY TAKEOUT BUILDING <br /> PERIVII T S.. <br /> Owner-Builder must submit the following with the application: Contractor must submit the following with the application: <br /> • A property tax statement or a recorded deed . Current license numbers and a worker's compensation <br /> • A completed and signed "Owner-Builder Verification" insurance certification (this is not necessary if this <br /> form information is already on file with the Department) <br /> • A completed"Authorization for Application"form if other • A waiver form if the contractor is not subject to worker's <br /> than the owner applies compensation laws <br /> • A completed "Authorized to Sign" form if other than the <br /> contractor applies (this is not necessary if this information <br /> is already on file with the Department) <br /> F nl fY:u1 NlYfl RFlll f1FRgM'AIMY APP RFV AMQp 7 <br />