My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0008830
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PELTIER
>
6535
>
2600 - Land Use Program
>
PA-1100124
>
SU0008830
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:33:41 AM
Creation date
9/8/2019 12:42:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0008830
PE
2631
FACILITY_NAME
PA-1100124
STREET_NUMBER
6535
Direction
E
STREET_NAME
PELTIER
STREET_TYPE
RD
City
ACAMPO
APN
00526045
ENTERED_DATE
7/21/2011 12:00:00 AM
SITE_LOCATION
6535 E PELTIER RD
RECEIVED_DATE
7/21/2011 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\P\PELTIER\6535\PA-1100124\SU0008830\APPL.PDF \MIGRATIONS\P\PELTIER\6535\PA-1100124\SU0008830\CDD OK.PDF \MIGRATIONS\P\PELTIER\6535\PA-1100124\SU0008830\EH COND.PDF \MIGRATIONS\P\PELTIER\6535\PA-1100124\SU0008830\EH PERM.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
X. SITE APPROVAL <br /> /I J SAN JOAQUIN COUNTY COMMUNITY DEVELOPMENT DEPARTMENT <br /> 1816 E. HAZELTON AVENUE, STOQKTON CA 95205 <br /> BUSINESS PHONE: (209)468-5121 <br /> ,�,4 <br /> ,4 <br /> Business Hours: 8:00 a.m.to 5:01)p.m, (Monday through.Friday) <br /> R <br /> -ICATIONR OCESSIN9�§TE <br /> STEP I CHECK WITH STAFF- Devel2pment Services Staff WIII explain the requirements and procedures to you. <br /> STEP 2 SUBMIT YOUR APPLICATION -When you apply,file all of the following: <br /> • FEE The staff will let you know the current cost of filing an application. Make checks.payable to the San Joaquin <br /> County Treasurer. <br /> • FORM Seven(7)oopleseof the completed application information forms(attached)which all owners must sign. <br /> • SITE PLAN Seven(7)copies of a folded Site Plan(see attached)and two(2)copies of a legible 13-112"Ix 11'site plan, <br /> • HAZARDOUS One copy of a completed Hazardous Materials Disclosure Survey form(a copy of the form is attached). <br /> MATERIALS <br /> DEED One copy of-the reoorded deed(s)of the propqrty. <br /> SERVICES if your project requires connection to public facilities,you must submit a"will-serve"letter from the appropriate <br /> water,sewer and drainage entities at the time of filing. This letter must Include a statement from the agency <br /> that they-will serve the proposed development,and has,or will have,the capacity to provide such service. <br /> • APPLICATION Staff will check your application. if anything is missing,you Will be notified in writing. The applicant will be <br /> COMPLETE sent a postcard once the application has been determined complete.-ffiqur agplication cannot be processed <br /> until lt!g complgie-) <br /> STEP 3 APPLICATION PROCESSING <br /> * CEQA The County will decide,if the proposal will have an adverse effect on the environment if there are no adverse <br /> effects-,the applIcatlory will be processed. If there are potential adverse effects,further environmental review <br /> will be requited. Projects that have the potential to adversely affect the environment wilt require the <br /> preparation of an E.I.R. This may extend the processing time. <br /> * REFERRALS Staff will refer the application to any County departments,other agencies and surrounding property owners <br /> AND ACTION affected by your proposal. At the end of a review and comment period the staff will approve yourappliGation if <br /> they can make requIred findings. If the staff cannot make the required findings,the.application Will be denied. <br /> Typically action will be taken on the project within 7-8weeks, <br /> * FINAL ACTION The action of the staff can be appealed to the Planning Commission- The staffs action is final unless <br /> appealed. For further Information on flie length of thoappeal period,contact the staff. <br /> STEP 4 CONDITIONS AND ADDITIONAL PERMITS <br /> • CONDITIONS The staff will send you the final action and if it is approvai it will list conditions,by department,that must be met <br /> before you can start project. <br /> • IMPROVEMENT In addition to the Site Plan,an 1mprovemen1plag is frequently required as a condition of approval. This is an <br /> PLANS engineered plan showing drainage,grading,frontage improvements,access,on-and off-site service and utility <br /> facilities,landscaping and cirmlabollfp2rk!rig details. <br /> • DRIVEWAY Driveway Permits must be acquired from the Public VVWkS Department for any work performed within the <br /> PERMITS road right of way. If the project fronts on a state highway these permits are obtained from,Caltrans. <br /> • SANITATION& Projects that will utilize new on-site sanitation disposal and/or on-site wells,must get permits from the <br /> WELL PERMITS Environmental Health Division. <br /> • BUSINESS If the project involves a business,a Business License must be approved prior to starting operation. Business <br /> LICENSES License applications can be processed concurrently with the Site Approval applicatibri. <br /> • BUILDING If the project involves construction a building permit must be approved priorto commencement of work. <br /> PERMITS <br /> • OTHER Frequently other local,state and/or federal agencies will require permits prior to new uses being established <br /> PERMITS (e.g-Air Pollution Control District,Regional Water Quality Control Board or the Sheriff's Office). The <br /> Community 0 evelopment Department will identify additional,permits we are aware of that may be-required for <br /> your 2Luject. <br /> RMEVSVL�Planning Appf=bon Forms\&(a AppravA(Revised e2-0110) Page 1 of 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.