Laserfiche WebLink
Corinne King -2- <br /> Community Development Department <br /> PA-1200158(SA) <br /> gates shall be set back a minimum of fifty-two (52)feet from the right-of-way unless the driveway is <br /> clearly marked as"Exit Only". (Development Title Section 9-1145.5) <br /> 3. The owner shall execute an Irrevocable Offer and Agreement to Dedicate Road to result in a forty-two <br /> (42)foot wide right-of-way from the centerline of Peltier Road to the property line across the parcel's <br /> frontage. (A fee based on the current fee schedule at time of payment is required for processing per <br /> Development Title Table 9-240.2 in addition to a copy of the Grant Deed and a legal description of the <br /> parcel to be offered for dedication.)(Development Title Section 9-1150.5) <br /> 4. For each Phase,the Traffic Impact Mitigation Fee shall be required for any incremental traffic created <br /> as a result of this development. The fee is due and payable at the time of building permit application. <br /> The fee shall be automatically adjusted July 1 of each year by the Engineering Construction Cost <br /> Index as published by the Engineering News Record. (Resolution R-00-433) <br /> 5. For each Phase,the Regional Transportation Impact Fee shall be required for any incremental traffic <br /> created as a result of development. The fee is due and payable at the time of building permit <br /> application. The fee will be based on the current schedule at the time of payment. (Resolution R-06- <br /> 38) <br /> 6. For each Phase,a copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 7. For each Phase,verification shall be obtained from the Solid Waste Division(468-3066)that this <br /> development has met the requirements of the Waste Plan Format for Development Projects. Final Site <br /> Plan is required upon submittal of verification. <br /> 8. All new structures and substantial improvements located in the area of historic flooding shall be <br /> elevated a minimum of two feet above the highest adjacent grade. (Development Title Section <br /> 9-1605.3(f) &9-1605.3(6)) <br /> 9. A San Joaquin County `Watercourse Encroachment Permit' will be required for all work done on Gill <br /> Creek and its banks. <br /> 10. All structures shall be set back a minimum of 25 feet from the top of bank of Gill Creek. <br /> 11. The developer shall provide drainage facilities and meet the requirements of San Joaquin County <br /> Development Standards to prevent the increased runoff release rate of storm water from discharging <br /> onto other properties and to prevent offsite sediment transport. Retention basins shall be fenced with <br /> six(6)foot high chain link fence or equal when the maximum design depth is 18 inches or more. <br /> Required retention basin capacity shall be calculated and submitted along with a drainage plan for <br /> review and approval,prior to release of building permit.(Development Title Section 9-1135) <br /> 12. File `Permit Registration Documents' (PRD)with the State Water Resources Control Board <br /> (SWRCB),and submit the `Waste Discharge Identification Number(WDID) issued by SWRCB to <br /> Public Works. Comply with run-off reduction requirements as detailed in the Stormwater Quality <br /> Control Criteria Plan available at Public Works or online at <br /> http://www.Si cicanwater.ora/PDF%20Documents/2009%2OFinal°/u20S WOCCP.pdf <br /> Informational Notes: <br /> (i.) This property is subject to the requirements of San Joaquin County Mosquito&Vector Control <br /> District(209-982-4675) and the California Health and Safety Code for the prevention of mosquitoes. <br /> Best Management Practices(BMP)guidelines for stormwater devices,ponds and wetlands are <br />