Laserfiche WebLink
CONDITIONS OF APPROVAL <br /> SA-99-59 <br /> Sunseeds Company <br /> Site Approval Application No. SA-99-59 was approved by the San Joaquin County Community <br /> Development Department on August 25, 1999. The effective date of approval is September 4, 1999. <br /> This approval will expire on March 5, 2001, which is 18 months from the effective date of approval, <br /> unless (1) all Conditions of Approval have been complied with, (2) all necessary building permits <br /> have been secured and remain in force, and (3) all necessary permits from other agencies have <br /> been secured and remain in force. <br /> Unless otherwise specified, all Conditions of Approval and Ordinance requirements shall be fulfilled <br /> prior to the establishment of the use and the issuance of any building permits. Those Conditions <br /> followed by a Section Number have been identified as Ordinance requirements pertinent to this <br /> application. Ordinance requirements cannot be modified, and other Ordinance requirements may <br /> apply. <br /> 1. COMMUNITY DEVELOPMENT DEPARTMENT (Staff Contact: Kai Luoma, 468-9567) <br /> a. BUILDING PERMIT: Submit an "APPLICATION-COMMERCIAL BUILDING PERMIT." The Site <br /> Plan required as a part of the building permit must be prepared by a registered civil engineer or <br /> licensed architect. This Plan must show drainage, driveway access details (including gates), on-site <br /> parking, landscaping, signs, existing and proposed utility services, and grading (refer to the "SITE <br /> PLAN CHECK LIST" for details). A fee is required for the Site Plan review. (Development Title <br /> Section 9-884) <br /> b. APPROVED USE: This approval is for the expansion of an existing seed research facility in three <br /> phases over five years as shown on the Plan submitted July 15, 1999. <br /> (1) Phase 1 will include a 5,200-square-foot agriculture equipment storage, shop, and pesticide <br /> storage building. <br /> (2) Phase 2 will include four 3,200-square-foot greenhouses. <br /> (3) Phase 3 will include a 500-square-foot cold storage/ripening building. <br /> c. STORM DRAINAGE: Storm water drainage shall be retained on the site. The drainage pattern and <br /> corresponding storm drain improvements shall be shown on the Site Plan. Drainage calculations <br /> prepared by a registered civil engineer or architect shall be included. <br /> d. PARKING: Off-street parking shall be provided and comply with the following: <br /> (1) All automobile and truck parking spaces and all major circulation drive lanes (automobile and <br /> truck)shall be surfaced and permanently maintained with base material of appropriate depth and <br /> asphalt concrete or Portland cement concrete to provide a durable, dust-free surface. Bumper <br /> guards shall be provided where necessary to protect adjacent structures or properties. All other <br /> areas that are used for vehicular traffic shall be surfaced and permanently maintained with a chip <br /> seal. Aggregate base may be used for trailer storage areas. <br /> Conditions of Approval - 1 - SA-99-59 <br />