Laserfiche WebLink
oPqu rN c E l <br /> SAN JOAQUIN COUNTY <br /> ENVIRONMENTAL HEALTH DEPARTMENT <br /> 304 E Weber Avenue 3rd Floor Stockton- CA 95202-2708 <br /> (209)468-3420-Fax.(209)464-0138 - Web:www.co,san-joaquin.ca.us/ehd <br /> �IFaR <br /> NITRATE LOADING STUDY REQUIREMENT CHECKLIST <br /> SITE LOCATION: PA#: 07cndy� <br /> REPORT DATE: � <br /> = Sufficient <br /> I = Insufficient San Joaquin County Development Title Chapter 9-1105,Section 9-1105.2 <br /> S I 1.0 CHEMICAL AND PHYSICAL PROPERTIES OF SOIL <br /> �''�Y LI ❑ 1.1 Description of the chemical and physical properties of the soils underlying the site. <br /> ja ❑ 1.2 Description of the mass transport properties of the soils underlying the site with respect to nitrate and/or any other <br /> constituent of concern identified for the project site. <br /> 2.0 GROUNDWATER ANALYSIS <br /> t����'4 ❑ 2.1 Description of:depth to groundwater,seasonal fluctuations of groundwater depth, directional flow and gradient. <br /> Er ❑ 2.2 Description/discussion of any existing or potential groundwater contamination issues in the general location of the <br /> site. <br /> `� ❑ 2.3 Description of the current use of groundwater at the site and of the future expected use of groundwater as related <br /> to the proposed development project. <br /> 3.0 SOURCES AND CALCULATED IMPACT OF NITRATE TO GROUNDWATER <br /> ] ❑ 3.1 Description of all current off-site sources of nitrate to soil and groundwater in the general up gradient area and the <br /> contribution of nitrate load from these sources to the project site. <br /> "� ❑ 3.2 Description of impact of rainfall contribution of nitrate load to the project site. <br /> �� ❑ 3.3 Description of all current on-site sources of nitrate to soil and groundwater and the contribution of nitrate load from <br /> Y these sources to the project site. <br /> ❑ 3.4 Description of all proposed future on-site sources of nitrate to soil and groundwater and the contribution of nitrate <br /> load from these sources to the project site. <br /> �S� ❑ 3.5 Calculated mass balance of nitrogen loading considering all potential sources identified. Use of <br /> Nanztch/Finnemore,or other appropriate formula/model, if applicable. <br /> ❑ 3.6 Calculated impact of nitrogen loading from site project to down gradient wells, rivers, lakes etc. <br /> 4.0 DISCUSSION OF NITRATE LOADING RESULTS RELATIVE TO PROPOSED METHOD <br /> OF WASTEWATER DISPOSAL <br /> ❑ 4.1 Discussion of total nitrate impact from proposed project. <br /> ❑ 4.2 Description of the methods proposed to mitigate any known or future impact to soil and groundwater from nitrate, <br /> and/or any other constituent of concern, at and/or around the project site. <br /> 5.0 CONCLUSIONS AND RECOMMENDATIONS SECTION <br /> '®— ❑❑'_ 5.1 The report was signed,dated and stamped by a qualified environmental professional. <br /> 5.2 The attachments/appendices contain sufficient documentation to support claims made in the report. <br /> Reviewed By: Lisa Medina Sr. R.E.H.S. Reviewed Date:���� , <br /> i <br /> EHD 26-02-002 Page I of 2 <br /> 7/14/2003 Surface&Sub Checklist <br />