Laserfiche WebLink
0 <br /> Project Name Macchia Winery Page 2 of 2 <br /> Our Project Number: E07146A <br /> Date October 29, 2007 <br /> Based on this method, an estimate for the deep percolation of rain for the site is 14,06 <br /> inches Due to the soils which allow fairly rapid infiltration, we estimate the deep <br /> percolation of rain is based on 80 percent of the long-term average tota/rain fa//for the <br /> Lodi area (hftp,www.wrcc.dr/.edu): 17.57 inches x 0.8 = 14.06 inches The nitrate <br /> concentration of rainfall was estimated to be i mg/L-N(Hani!2 the and Finnemore, <br /> 1992). <br /> We appreciate this opportunity to be of service. If you have any questions please feel <br /> free to contact our office. <br /> Sincerely, <br /> NEIL O. ANDERSON&ASSOCIATES, INC. <br /> I Daniel E. Kramer, B.Sc. VavidWelch, Principal Geologist <br /> Staff Geologist CEG-2151, CHG-653, PGP-1049 <br /> i <br /> Attachments (2) — Precipitation for Lodi, Ca (Plate 9) <br /> Nitrate Loading Calculation Worksheet (Plate 10) <br /> 902 Industrial Way•Lodi,CA 95240•209.367.3701 •Fax 209.369.4228 - C2007 Nett 0.Anderson&Associates,Inc. <br />