Laserfiche WebLink
OPpU1N C <br /> ? THOMAS R. FLINN <br /> 2: z ,)UNTY OF SAN JOAC,_ <br /> DEPUTY DIRECTOR <br /> DEPARTMENT OF PUBLIC WORKS <br /> P.O. BOX 1810- 1810 E. HAZELTON AVENUE <br /> • �`'' `P STOCKTON, CALIFORNIA 95201 STEVEN WIN <br /> 4� kORa DEPUTY DIRECTOR <br /> (209) 468-3000 <br /> MANUEL LOPEZ FAX (209) 468-2999 <br /> DIRECTOR <br /> June 27, 2000 <br /> MEMORANDUM JUN 282000 <br /> TO: Kerry Sullivan, Deputy Director Community Developlment Dept.Development Department <br /> CONTACT PERSON: Kai Luoma <br /> FROM: Ben E. Neely, Engineer II -73p-tJ <br /> Public Services Division <br /> SUBJECT: MS-00-09, LA-00-41 A MINOR SUBDIVISION APPLICATION TO SUBDIVIDE A <br /> 59 ACRE PARCEL INTO TWO PARCELS. PARCEL ONE TO BE 5.15 ACRES AND <br /> PARCEL TWO TO BE 54.19 ACRES. A LOT LINE ADJUSTMENT APPLICATION <br /> TO REDUCE THE SIZE OF PARCEL ONE FROM 5.15 ACRES TO 3.0 ACRES AND <br /> INCREASE THE SIZE OF PARCEL TWO FROM 54.19 ACRES TO 56.2 ACRES, <br /> LOCATED ON THE EAST SIDE OF PEZZI ROAD, 3000 FEET NORTH OF <br /> COMSTOCK ROAD. <br /> (DISTRICT 4). <br /> APPLICANT: Delores Stevens/Elaine Campigli APN: 089-030-08 and 11 <br /> INFORMATION: <br /> The site is not currently located within a Federal Flood Insurance Administration Designated Flood <br /> Hazard Area. The flood zone is "B and C" and zone "B" per the Flood Insurance Rate Map (FIRM) <br /> 060299 0 315 A Dated 5/15/80.. <br /> Pezzi Road has an existing right-of-way width of 40 feet and a planned right-of-way width of 50 feet. <br /> The Traffic Impact Mitigation Fee will be required when parcels are developed. The fee is due and <br /> payable at the time of building permit application. <br /> The Water Supply Facilities Impact Mitigation Fee will be required when parcels are developed. <br /> The fee is due and payable at the time of building permit application. <br /> RECOMMENDATIONS: <br /> MS-00-09 <br /> 1. A Parcel Map is required. (Development Title Section 9-915.2) <br /> 2. (Irrevocable Offer of) Dedication to result in a 25-foot wide right-of-way from the centerline of <br /> Pezzi Road to the property line shall be required across the frontage of Parcel One. <br /> (Development Title Section 9-1150.5(b)) <br /> 3. All easements of record shall be shown on the Parcel Map. <br /> (Development Title Section 9-910.20) <br />