Laserfiche WebLink
Mr. Swanson Page 4 of 4 <br /> PA-0700012(SA) <br /> Construction activity mitigation measures include: <br /> Limit area subject to excavation, grading, and other construction activity at any one <br /> time <br /> Limit the hours of operation of heavy duty equipment and/or the amount of <br /> equipment in use <br /> Replace fossil-fueled equipment with electrically driven equivalents (provided they <br /> are not run via a portable generator set) <br /> Require that all diesel engines be shut off when not in use to reduce emissions from <br /> idling <br /> Curtail construction during periods of high ambient pollutant concentrations; this may <br /> include ceasing of construction activity during the peak-hour of vehicular traffic on <br /> adjacent roadways, and "Spare the Air Days" declared by the District. <br /> implement activity management (e.g. rescheduling activities Lo reduce short-term <br /> impacts) <br /> During the smog season (May through October), lengthen the construction period to <br /> minimize the number of vehicles and equipment operating at the same time. <br /> Off road trucks should be equipped with on-road engines when possible. <br /> Minimize obstruction of traffic on adjacent roadways. <br /> District staff is available to meet with you and/or the applicant to further discuss the <br /> regulatory requirements that are associated with this project. If you have any questions <br /> or require further information, please call Jon Klassen at (559) 230-5843 and provide <br /> the reference number at the top of this letter. <br /> Sincerely, <br /> David Warner <br /> Director of Permits Services <br /> Arnaud Marjollet <br /> Permit Services Manager <br /> DW: jk <br /> cc: File <br />