Laserfiche WebLink
1 V <br /> i <br /> f C) L <br /> pquiN <br /> THOMAS R. Ft INN P.O.BOX 1810-1810 E.HAZELTON AVENUE <br /> STOCKTON,CALIFORNIA 95201 <br /> DIRECTOR (209)468-3000 FAX(209)468-2999 <br /> •�'�;Fa•Ra`"• www.sjgov.orglpubworks <br /> THOMAS M.GAU <br /> CHIEF DEPUTY DIRECTOR - <br /> MICHAEL SELLING y - YOU RECIEVED <br /> DEPUTY DIRECTOR <br /> STEVEN WINKLER .. _ AIV .. 2010 <br /> DEPUTY DIRECTOR <br /> ROGER JANES COMMun4 D@VBIO m <br /> BUSINESS ADMINISTRATOR p ��#17G�}. <br /> January 6, 2010 <br /> I <br /> MEMORANDUM <br /> TO: Rick Griffin, Senior..Planner, <br /> Community Development Department ; <br /> CONTACT PERSON: Rick Griffin <br /> p <br /> FROM: _.Bill DuBois, Engineer III <br /> Public Services Division <br /> SUBJECT: PA-0900300;A Site Approval application for an expansion of an existing agricultural sales <br /> operation. This is to expand by adding a 7,200 square foot storage building. This project is over <br /> the allotted 25% expansion; located on the west side of S. Prescott Road, 300 feet south of <br /> French Camp Road. (Supervisorial District 5) <br /> PROPERTY OWNER: Wilbur-Ellis Company APPLICANT: Same <br /> ADDRESS: 13771 S.Prescott Road,Manteca APN: 206-080-04 <br /> INFORMATION: <br /> The site is not currently located within a Federal Flood Insurance Administration Designated Flood Hazard Area. <br /> Prescott Road has an existing right-of-way width of 50 feet and a planned right-of-way width of 50 feet. <br /> RECOMMENDATIONS: <br /> I. The Traffic Impact Mitigation Fee shall be required for this development. The fee is due and payable at the <br /> time of building permit application. The fee shall be automatically adjusted July I of each year by the <br /> Engineering Construction Cost Index as published by the Engineering News Record. (Resolution R-00-433) <br /> 2. The Regional Transportation Impact Fee shall be required for this development. The fee is due and payable at <br /> the time of building permit application. The fee will be based on the current schedule at the time of payment.. <br /> (Resolution R-06-38) <br /> 3. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 4. Verification shall be obtained from the Solid Waste Division (468-3066) that this development has met the <br /> requirements of the Waste Plan Format for Development Projects. Final Site Plan is required upon submittal <br /> of verification. <br /> I <br />