Laserfiche WebLink
e <br /> 11 . Please include a copy of any studies ( soils , geology, marketing, <br /> etc . ) that you may have had prepared for this project or project <br /> site . <br /> C . PROJECT CHARACTERISTICS <br /> 1. Services : Indicate how the following services will be provided <br /> for your project and availability of service . <br /> a . Water Supply: Existing well 30hp/1100 GPM. <br /> b. Sewage Disposal : Septic tank with county approved leach line. <br /> C. Storm Drainage: on site. <br /> If an extension of any of the above is necessary, indicate <br /> which service( s ) , what agency will be providing the <br /> service( s ) , and the distance of the extension( s ) : N/A <br /> d. Natural Gas : Not available (Propane office heating) <br /> e. Electricity: P. G. 6 F. <br /> f . Road/Access ( i .e . , paved, unpaved, public/private, road name ) : <br /> French Camp to Prescott <br /> g. Fire:See AttachedDi stance to nearest fire station: 2. 8 miles <br /> h . Schools :- New Haven School , 2. 5 miles distance <br /> 2 . Describe any site alterations which result from the proposed pro- <br /> ject ( specifically address the amount and location of grading, <br /> cuts and fills, vegetation removal, alterations to drainage, <br /> removal of existing structures , number of trees removed, etc. ) . <br /> See drawing 0005, removal of 4 acres of Almonds <br /> 3. Air Quality Information: <br /> Number and type of vehicles associated with completed project <br /> Approximately 2 forklifts, 4 company owned delivery trucks and 7 sales <br /> representatives ' sedans or pickups. <br /> Types of emissions and sources associated with project Normal above <br /> ground tank venting of liouid fertilizers and farm chemicals <br /> Fuel sources (and amounts ) to be consumed by or as a result of the <br /> completed project Normal consumption of propane and electricity for <br /> warehousing operation. <br /> Will the project result in substantial air emissions or deteriora- <br /> tion of ambient air quality? X NO YES <br /> 4 . How much agricultural land will be removed from production? <br /> Irrigated 3-5 acres Not irrigated <br /> Use Permit Application - 9 - ( 6/86 ) <br />