Laserfiche WebLink
YES NO <br /> 6. Energy/Natural Resources: <br /> a. Will the project use substantial <br /> amounts of fuel or energy, require <br /> a substantial increase in demand upon <br /> existing sources, or require the <br /> development of new sources of energy? X <br /> b. Will the project affect the <br /> potential use, extraction, <br /> conservation, or depletion of a <br /> natural resource (other than <br /> agricultural land) ? X <br /> Other sources used: <br /> 7 . Hazards: <br /> a. Will the project create a risk of <br /> explosion; release, generate or <br /> store any hazardous substances; or <br /> cause other dangers to public health <br /> and safety? X* <br /> b. Are there any known hazardous <br /> substances located within 500 feet of <br /> the boundaries of this project, if in <br /> an existing or proposed residential <br /> area (this could include possible <br /> groundwater contamination) ? <br /> C. Will the project result in <br /> interference with, or need for, <br /> emergency plans? X* <br /> Other sources used: County Hazardous Materials Site May <br /> 8. utilities and Public Service: <br /> ** a. Will the project require alteration of, <br /> addition to, or the need for new utility <br /> systems (water, sewer, drainage, solid <br /> waste) , including a Sphere of Influence <br /> or district boundary change? x <br /> Initial Study (Rev: 01/91) <br /> 5 <br />