Laserfiche WebLink
ATTACHMENT <br /> Kusalakari Corporation <br /> KUSALAKARI !,!HDITATION CENTER <br /> 9698 S. Priest Road, French Camp, CA 95231 <br /> List of Buildings and Structures (existing and proposed) in the Center <br /> Overall <br /> Structure Ground Floor phase Height <br /> Number Area(Sq. Ft ). <br /> Proposed Use (,n feet) <br /> PROPOSED BUILDINGS AND STRUCTURES: <br /> 4 Assembly Hall/Sitting Meditation -Assembly/Sitting Meditation 4,890 1 25.0 <br /> 5 Public Restrooms- Dispose of Waste 1,500 1 14.0 <br /> Underground Septic Tank/Leach Fields (4 Areas) -Waste Collection and <br /> 6 Treatment including secondary and replacement areas. 8,040 1 2.0 <br /> 7 Underground Water Well-Supply water for daily use 100 1 7.0 <br /> 10 Festival Areas Paved - For religious events 7,141 2 14.0 <br /> 11 a. Garden - For pleasant sight seeing 20,388 2 14.0 <br /> b. Storm Drainage Pond -To store overflows of water in the compound 9,320 2 2.0 <br /> 12 Arnandar Pagoda - Pay respect to Buddha/meditation 16,900 2 80.0 <br /> a. Meditation Cabins- For Visitors' Stay during Meditation <br /> 13 3,480 2 24.0 <br /> Sessions/Retreats <br /> b. Storage Area -To keep the Center's equipment, appliance, supplies etc. 372 2 7.0 <br /> 14 a. Stucco Wall & Sign - Security& Name of the Center 490 2 7.0 <br /> b. Gates-Security of the Center 100 2 25.0 <br /> Notes: Fire Access: <br /> a. Around Arnandar Pagoda Area: 11' 6" to 18' 6" wide 1 <br /> b. Around Cabins Area: 10' 0" to 16" 6" wide 1 <br /> EXISTING BUILDINGS AND STRUCTURES: <br /> A. Home -A monk at site will be living 3,960 0 20.0 <br /> Warehouse - Extend and renovate as assembly/meditation hall ( See <br /> E. 1,440 1 25.0 <br /> Structure 4 above) <br /> F. Underground Water Well - Used as before. 12 0 5.0 <br /> G. Leaves Burner- Dried leaves to be burnt used as before. 6 0 3.5 <br /> Dated : 23-Jul-12 <br />