My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0006597_SSNL
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
10420
>
2600 - Land Use Program
>
PA-0700260
>
SU0006597_SSNL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:52:18 PM
Creation date
9/8/2019 12:48:45 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
FileName_PostFix
SSNL
RECORD_ID
SU0006597
PE
2691
FACILITY_NAME
PA-0700260
STREET_NUMBER
10420
Direction
N
STREET_NAME
STATE ROUTE 99
City
STOCKTON
APN
08607034
ENTERED_DATE
6/13/2007 12:00:00 AM
SITE_LOCATION
10420 N HWY 99
RECEIVED_DATE
6/12/2007 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\N\HWY 99\10420\PA-0700260\SU0006597\SS STDY.PDF \MIGRATIONS\N\HWY 99\10420\PA-0700260\SU0006597\NL STDY.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F1 n <br /> May 17,2007 <br /> NOA Project Number: E07064A <br /> FA4.0 DISCUSSION OF NITRATE LOADING RESULTS <br /> 4.1 Total Nitrate Impact <br /> Based on the method and assumptions described, the result of the nitrate loading balance indicates <br /> that the proposed development on the proposed parcels should not cause a build up of nitrate in the <br /> ground water above 10 mg/L-N over the long term. (� <br /> I <br /> 4.2 Methods of Mitigation <br /> Because of the favorable result of the nitrate loading calculation, no mitigation measures areFi ��2J <br /> warranted. <br /> 5.0 CONCLUSIONS AND RECOMMENDATIONS <br /> Our office concludes that the proposed project will not cause a build up of nitrates above 10 <br />{I mg/L-N in the ground water. We recommend the EHD guidelines be followed for the construction <br /> of a standard septic system. <br /> F1 6.0 LIMITATIONS <br /> Our professional services were performed, our findings obtained, and our conclusions proposed in <br /> �j accordance with generally accepted engineering principles and practices. This warranty is in lieu of <br /> 1 all other warranties either expressed or implied. Test findings and statements of professional �5 <br /> opinion do not constitute a guarantee or warranty, expressed or implied. l <br /> NEIL O.ANDERSON&ASSOC., INC. <br /> R <br /> F== <br /> F; Na cy R. am ,B.A. DWelch,elch, Principal Geologist <br /> Sta Scientist CEG-2151, CHG-653,PGP-1049 <br /> F <br /> i o��SS1flNAL GEO`D <br /> I aQ DAVID J.WELCH �'J <br /> * <br /> NO.2151 <br /> CERTIFIED <br />€ � <br /> ENGINEERING <br /> GEOLOGIST Q` <br /> 7 OF CAUL <br />
The URL can be used to link to this page
Your browser does not support the video tag.